Seepage repairing process for elevator shaft side wall and ground
The invention discloses a seepage repairing process for an elevator shaft side wall and ground. The seepage repairing process comprises the special steps of pretreatment, seepage stoppage treatment, base cleaning, first-layer waterproof treatment, second-layer waterproof treatment, maintenance treatment and acceptance check. A high-elasticity coating can be formed by using special polyurethane polymer slurry and waterproof paint in the seepage repairing process for the elevator shaft side wall and the ground, the elevator shaft side wall is firmly bonded with the ground, the long-term water seepage problem between the elevator shaft side wall and the ground is avoided, the seepage repairing process for the elevator shaft side wall and the ground is greatly improved, and the water seepage problem of the elevator shaft side wall and the ground is greatly reduced.
本发明公开了一种电梯井侧墙与地面渗漏修缮工艺,该工艺包括:预处理、堵漏处理、清理基层、第一层防水处理、第二层防水处理、养护处理以及验收等特殊的修缮工艺,加上使用特定的聚氨酯高分子浆液和防水涂料能在电梯井侧墙与地面渗漏修缮工艺中能形成高弹性涂层,将电梯井侧墙与地面上粘结牢固,避免了电梯井侧墙与地面长期出现渗水的问题,极大的完善了对电梯井侧墙与地面渗漏的修缮工艺,极大的减少了电梯井侧墙与地面出现渗水的问题。
Seepage repairing process for elevator shaft side wall and ground
The invention discloses a seepage repairing process for an elevator shaft side wall and ground. The seepage repairing process comprises the special steps of pretreatment, seepage stoppage treatment, base cleaning, first-layer waterproof treatment, second-layer waterproof treatment, maintenance treatment and acceptance check. A high-elasticity coating can be formed by using special polyurethane polymer slurry and waterproof paint in the seepage repairing process for the elevator shaft side wall and the ground, the elevator shaft side wall is firmly bonded with the ground, the long-term water seepage problem between the elevator shaft side wall and the ground is avoided, the seepage repairing process for the elevator shaft side wall and the ground is greatly improved, and the water seepage problem of the elevator shaft side wall and the ground is greatly reduced.
本发明公开了一种电梯井侧墙与地面渗漏修缮工艺,该工艺包括:预处理、堵漏处理、清理基层、第一层防水处理、第二层防水处理、养护处理以及验收等特殊的修缮工艺,加上使用特定的聚氨酯高分子浆液和防水涂料能在电梯井侧墙与地面渗漏修缮工艺中能形成高弹性涂层,将电梯井侧墙与地面上粘结牢固,避免了电梯井侧墙与地面长期出现渗水的问题,极大的完善了对电梯井侧墙与地面渗漏的修缮工艺,极大的减少了电梯井侧墙与地面出现渗水的问题。
Seepage repairing process for elevator shaft side wall and ground
一种电梯井侧墙与地面渗漏修缮工艺
DUAN PING'E (Autor:in)
07.08.2020
Patent
Elektronische Ressource
Chinesisch