Secondary utilization method for construction waste foundation
The invention provides a secondary utilization method for a construction waste foundation. The secondary utilization method for the construction waste foundation comprises the following steps that theconstruction waste foundation, a ground foundation and equipment are analyzed, and data are obtained; and expansion processing or top surface processing is carried out according to the data, whereinthe expansion treatment comprises the steps that excavating, reinforcing and pouring are carried out according to the new foundation data, a new foundation is formed on the periphery of the construction waste foundation, and an equipment foundation is obtained. According to the method, abandoned underground construction waste does not need to be dismantled, so that the adverse effects on surrounding structures caused by dismantling is avoided; the bearing capacity of the existing abandoned underground construction waste is fully utilized through the method, so that the overall cost and construction period of foundation construction are reduced; and the method is widely suitable for secondary construction in industrial abandoned sites, and is particularly suitable for large equipment foundations in the secondary construction process.
本发明提供了一种建筑垃圾基础二次利用方法。本发明的建筑垃圾基础二次利用方法,包括如下步骤:对建筑垃圾基础、地基和设备进行分析,获取数据;根据所述数据进行扩展处理或顶面处理;其中,所述扩展处理包括:根据新基础数据进行开挖、加固、浇筑,在建筑垃圾基础外围形成新基础,获得设备基础。本发明的方法无需拆除废弃地下建筑垃圾,从而避免了因拆除而引起的对周围结构的不利影响,该方法充分利用现有废弃地下筑垃圾的承载能力,从而节省了整体基础施工的费用和工期。该方法广泛适用于对工业废弃场地内进行二次建设,尤其适用于二次建设过程中的大块式设备基础。
Secondary utilization method for construction waste foundation
The invention provides a secondary utilization method for a construction waste foundation. The secondary utilization method for the construction waste foundation comprises the following steps that theconstruction waste foundation, a ground foundation and equipment are analyzed, and data are obtained; and expansion processing or top surface processing is carried out according to the data, whereinthe expansion treatment comprises the steps that excavating, reinforcing and pouring are carried out according to the new foundation data, a new foundation is formed on the periphery of the construction waste foundation, and an equipment foundation is obtained. According to the method, abandoned underground construction waste does not need to be dismantled, so that the adverse effects on surrounding structures caused by dismantling is avoided; the bearing capacity of the existing abandoned underground construction waste is fully utilized through the method, so that the overall cost and construction period of foundation construction are reduced; and the method is widely suitable for secondary construction in industrial abandoned sites, and is particularly suitable for large equipment foundations in the secondary construction process.
本发明提供了一种建筑垃圾基础二次利用方法。本发明的建筑垃圾基础二次利用方法,包括如下步骤:对建筑垃圾基础、地基和设备进行分析,获取数据;根据所述数据进行扩展处理或顶面处理;其中,所述扩展处理包括:根据新基础数据进行开挖、加固、浇筑,在建筑垃圾基础外围形成新基础,获得设备基础。本发明的方法无需拆除废弃地下建筑垃圾,从而避免了因拆除而引起的对周围结构的不利影响,该方法充分利用现有废弃地下筑垃圾的承载能力,从而节省了整体基础施工的费用和工期。该方法广泛适用于对工业废弃场地内进行二次建设,尤其适用于二次建设过程中的大块式设备基础。
Secondary utilization method for construction waste foundation
一种建筑垃圾基础二次利用方法
CAO DONG (Autor:in) / BAI YUYONG (Autor:in) / GU XIAOBING (Autor:in) / YANG WEIKE (Autor:in) / ZHANG GUOZHU (Autor:in)
07.08.2020
Patent
Elektronische Ressource
Chinesisch
Foundation pit soil resource utilization construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Method for reinforcing foundation through construction waste
Europäisches Patentamt | 2020
|