Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation pit soil resource utilization construction method
The invention relates to the technical field of foundation pit soil, and discloses a foundation pit soil resource utilization construction method which comprises the following construction steps: 1) fine materials and coarse materials in foundation pit soil are separated, the fine materials and water are mixed to form slurry, and the coarse materials are discharged along a vibrating screen; 2) crushing the coarse material to form a crushed material; the crushed materials are subjected to multi-layer screening to form powder; (3) squeezing the slurry to form pug; 4) mixing and stirring the pug and the powder to form aggregate; 5) mixing and stirring the aggregate, cement and water to form a mixture; (6) conveying the mixture to a plurality of mold cavities for vibration pressing to form green bricks; (7) the green bricks are maintained for set time, and finished bricks are formed; foundation pit soil generated in construction is treated layer by layer to form aggregate, then the aggregate, cement and water are mixed and stirred to form a mixture, the mixture is formed into a green brick in a bench formwork vibration press, the land utilization rate is increased, the environment protection effect is achieved, and effective treatment of the foundation pit soil is well achieved.
本发明涉及基坑土的技术领域,公开了基坑土资源化利用施工方法,包括以下施工步骤:1)、基坑土中细料与粗料分离,细料与水体混合形成泥浆,粗料顺着振动筛排出;2)、粗料进行破碎形成破碎料;破碎料进过多层筛分形成粉料;3)、将泥浆通过压榨形成泥料;4)、泥料与粉料进行混合搅拌形成骨料;5)、骨料与水泥、水体混合搅拌,形成拌合料;6)、将拌合料输送至多个模腔进行振压,形成砖坯;7)、将砖坯养护设定时间,形成成品砖;将施工中产生基坑土,通过层层处理形成骨料,再将骨料与水泥以及水体混合搅拌,形成拌合料,拌合料在台模振压机中成型为砖坯,提高土地使用率及保护环境的效果,较好实现对基坑土的有效处理。
Foundation pit soil resource utilization construction method
The invention relates to the technical field of foundation pit soil, and discloses a foundation pit soil resource utilization construction method which comprises the following construction steps: 1) fine materials and coarse materials in foundation pit soil are separated, the fine materials and water are mixed to form slurry, and the coarse materials are discharged along a vibrating screen; 2) crushing the coarse material to form a crushed material; the crushed materials are subjected to multi-layer screening to form powder; (3) squeezing the slurry to form pug; 4) mixing and stirring the pug and the powder to form aggregate; 5) mixing and stirring the aggregate, cement and water to form a mixture; (6) conveying the mixture to a plurality of mold cavities for vibration pressing to form green bricks; (7) the green bricks are maintained for set time, and finished bricks are formed; foundation pit soil generated in construction is treated layer by layer to form aggregate, then the aggregate, cement and water are mixed and stirred to form a mixture, the mixture is formed into a green brick in a bench formwork vibration press, the land utilization rate is increased, the environment protection effect is achieved, and effective treatment of the foundation pit soil is well achieved.
本发明涉及基坑土的技术领域,公开了基坑土资源化利用施工方法,包括以下施工步骤:1)、基坑土中细料与粗料分离,细料与水体混合形成泥浆,粗料顺着振动筛排出;2)、粗料进行破碎形成破碎料;破碎料进过多层筛分形成粉料;3)、将泥浆通过压榨形成泥料;4)、泥料与粉料进行混合搅拌形成骨料;5)、骨料与水泥、水体混合搅拌,形成拌合料;6)、将拌合料输送至多个模腔进行振压,形成砖坯;7)、将砖坯养护设定时间,形成成品砖;将施工中产生基坑土,通过层层处理形成骨料,再将骨料与水泥以及水体混合搅拌,形成拌合料,拌合料在台模振压机中成型为砖坯,提高土地使用率及保护环境的效果,较好实现对基坑土的有效处理。
Foundation pit soil resource utilization construction method
基坑土资源化利用施工方法
LEI BIN (Autor:in) / SUN XIAOHUI (Autor:in) / TONG XIN (Autor:in) / LI XINLIN (Autor:in) / LIN MUYOU (Autor:in) / LIN QIANGYOU (Autor:in) / SHA ZHENHUI (Autor:in) / YANG JUNQING (Autor:in) / LI KAI (Autor:in) / FENG DONGDONG (Autor:in)
03.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
B09B
DISPOSAL OF SOLID WASTE
,
Beseitigung von festem Abfall
/
C04B
Kalk
,
LIME
Secondary utilization method for construction waste foundation
Europäisches Patentamt | 2020
|Filling construction method for improved soil through resource utilization of spoil
Europäisches Patentamt | 2023
|Construction method of soft soil foundation pile foundation
Europäisches Patentamt | 2021
|