Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prestressing force beam and slab collinear production technology
The invention relates to the technical field of beam and slab collinear production, and discloses a prestressing force beam and slab collinear production technology. The technology includes the following steps that first, the site is cleared up, so that the ambient site is made clean and sundries are avoided; and second, materials are prepared, and prestressing force steel stranded wires are wellprepared at first. According to the prestressing force beam and slab collinear production technology, prestressing force rib manufacturing and prestressing force rib blanking lengths should be determined through calculation, the prestressing force steel stranded wires are cut by an abrasive wheel cutting machine, the steel stranded wires required by each slab beam are laid at a corresponding beammanufacturing table position after being blanked, PVC pipes are used for isolation according to the isolation length needed by the drawing, then the two ends of the steel stranded wires are penetratedinto a tailored long-bar-shaped anchorage device and are further clamped by clamping sheets, prestressing force is prepared to be applied, the cut prestressing force steel stranded wires need to be placed in an overhead mode so that mechanical damage can be avoided, and the problem that an existing prestressing force beam and slab collinear production technology is incomplete, and thus manufacturing can be made inconvenient is avoided.
本发明涉及梁板共线生产技术领域,且公开了一种预应力梁板共线生产工艺,包括以下步骤:第一步:对场地进行清理,使得周围场地整洁,无杂物,第二步:准备材料,先准备好预应力钢绞线,该预应力梁板共线生产工艺,预应力筋制作,预应力筋下料长度应通过计算确定,预应力钢绞线断料采用砂轮切割机,将每片板梁所需要的钢绞线根数下好后铺放在制梁台位上,并按图纸要求的隔离长度用PVC管进行隔离,而后两端穿进定做的长条形锚具上,用夹片夹紧,准备施加预应力,断好料的预应力钢绞线要架空搁置,避免机械损伤,避免了现有的预应力梁板共线生产工艺由于其工艺的不完善,导致了制作不方便的问题。
Prestressing force beam and slab collinear production technology
The invention relates to the technical field of beam and slab collinear production, and discloses a prestressing force beam and slab collinear production technology. The technology includes the following steps that first, the site is cleared up, so that the ambient site is made clean and sundries are avoided; and second, materials are prepared, and prestressing force steel stranded wires are wellprepared at first. According to the prestressing force beam and slab collinear production technology, prestressing force rib manufacturing and prestressing force rib blanking lengths should be determined through calculation, the prestressing force steel stranded wires are cut by an abrasive wheel cutting machine, the steel stranded wires required by each slab beam are laid at a corresponding beammanufacturing table position after being blanked, PVC pipes are used for isolation according to the isolation length needed by the drawing, then the two ends of the steel stranded wires are penetratedinto a tailored long-bar-shaped anchorage device and are further clamped by clamping sheets, prestressing force is prepared to be applied, the cut prestressing force steel stranded wires need to be placed in an overhead mode so that mechanical damage can be avoided, and the problem that an existing prestressing force beam and slab collinear production technology is incomplete, and thus manufacturing can be made inconvenient is avoided.
本发明涉及梁板共线生产技术领域,且公开了一种预应力梁板共线生产工艺,包括以下步骤:第一步:对场地进行清理,使得周围场地整洁,无杂物,第二步:准备材料,先准备好预应力钢绞线,该预应力梁板共线生产工艺,预应力筋制作,预应力筋下料长度应通过计算确定,预应力钢绞线断料采用砂轮切割机,将每片板梁所需要的钢绞线根数下好后铺放在制梁台位上,并按图纸要求的隔离长度用PVC管进行隔离,而后两端穿进定做的长条形锚具上,用夹片夹紧,准备施加预应力,断好料的预应力钢绞线要架空搁置,避免机械损伤,避免了现有的预应力梁板共线生产工艺由于其工艺的不完善,导致了制作不方便的问题。
Prestressing force beam and slab collinear production technology
一种预应力梁板共线生产工艺
FENG JIANSEN (Autor:in) / JI YECHEN (Autor:in) / XU ZHIQI (Autor:in) / ZHAI YIMING (Autor:in) / LIU WEIQING (Autor:in) / XU ZHONGKUI (Autor:in) / YAN XIAOTIAN (Autor:in)
18.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
B24B
MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING
,
Maschinen, Einrichtungen oder Verfahren zum Schleifen oder Polieren
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Wind power generation tower multidirection prestressing force prefabricated beam slab foundation
Europäisches Patentamt | 2020
|Prestressing limits slab cracks
Engineering Index Backfile | 1965
Prestressing complex fiber reinforcing device for concrete slab beam and implementation process
Europäisches Patentamt | 2015
|Engineering Index Backfile | 1958
|Engineering Index Backfile | 1959
|