Wall wood base layer bottoming construction method
The invention provides a wall wood base layer bottoming construction method. The method comprises the steps that materials are prepared; wall surface floating ash impurities are cleaned, marks are done on corresponding ceilings of embedded pipelines, setting out construction is carried out, termite killing pesticide is sprayed and brushed to position, at the 1 to 1.5 height, returned to the wall from the ground by two to three times, moisture barrier materials are bonded on the wall, when a moisture barrier film is laid fully, a light steel keel fixing part is used for fixing, after the moisture barrier film is fixed, a dividing line is formed on the surface of the moisture barrier film in a line flipping manner, an attaching wall system fixing clamp is fixed to the wall, a keel is clampedon the fixing clamp, the perpendicularity and the horizontal flatness of the keel are adjusted, before an OSB board is fixed, corrosion, moisture and insect prevention treatment is carried out, the OSB board is subjected to line flipping and hole guide, a drill tail nail fixes the OSB board to the keel, and finally, whether a wall reserved switch and a socket meet the needs or not is checked. Through mounting of the moisture barrier film and the mounting technology of the wall wood base layer, the industrial standard is formed, the house live effect is further improved, and the method is worthy of industrial application.
本发明提供了一种墙面木基层打底的施工方法,准备材料;清理墙面浮灰杂物,在预埋管线相应吊顶上做好标记并开始进行放线施工,在地面返墙面1‑1.5米高喷刷灭白蚁药2‑3次,并将防潮材料黏贴于墙面,当防潮膜敷设满后用轻钢龙骨固定件固定;防潮膜固定后,在防潮膜表面弹好分割线,将贴面墙系统固定夹固定于墙面,然后将龙骨卡于固定夹上,调整龙骨的垂直度与水平平整度;在欧松板固定前做好防腐、防潮、防虫处理,欧松板应弹线并引孔,使用钻尾钉将欧松板固定于龙骨上,最后核对墙面预留开关、插座是否符合要求,本发明通过防潮膜的安装并将墙面木基层的安装技术形成行业标准,进一步提高房屋居住效果,值得行业推广。
Wall wood base layer bottoming construction method
The invention provides a wall wood base layer bottoming construction method. The method comprises the steps that materials are prepared; wall surface floating ash impurities are cleaned, marks are done on corresponding ceilings of embedded pipelines, setting out construction is carried out, termite killing pesticide is sprayed and brushed to position, at the 1 to 1.5 height, returned to the wall from the ground by two to three times, moisture barrier materials are bonded on the wall, when a moisture barrier film is laid fully, a light steel keel fixing part is used for fixing, after the moisture barrier film is fixed, a dividing line is formed on the surface of the moisture barrier film in a line flipping manner, an attaching wall system fixing clamp is fixed to the wall, a keel is clampedon the fixing clamp, the perpendicularity and the horizontal flatness of the keel are adjusted, before an OSB board is fixed, corrosion, moisture and insect prevention treatment is carried out, the OSB board is subjected to line flipping and hole guide, a drill tail nail fixes the OSB board to the keel, and finally, whether a wall reserved switch and a socket meet the needs or not is checked. Through mounting of the moisture barrier film and the mounting technology of the wall wood base layer, the industrial standard is formed, the house live effect is further improved, and the method is worthy of industrial application.
本发明提供了一种墙面木基层打底的施工方法,准备材料;清理墙面浮灰杂物,在预埋管线相应吊顶上做好标记并开始进行放线施工,在地面返墙面1‑1.5米高喷刷灭白蚁药2‑3次,并将防潮材料黏贴于墙面,当防潮膜敷设满后用轻钢龙骨固定件固定;防潮膜固定后,在防潮膜表面弹好分割线,将贴面墙系统固定夹固定于墙面,然后将龙骨卡于固定夹上,调整龙骨的垂直度与水平平整度;在欧松板固定前做好防腐、防潮、防虫处理,欧松板应弹线并引孔,使用钻尾钉将欧松板固定于龙骨上,最后核对墙面预留开关、插座是否符合要求,本发明通过防潮膜的安装并将墙面木基层的安装技术形成行业标准,进一步提高房屋居住效果,值得行业推广。
Wall wood base layer bottoming construction method
一种墙面木基层打底的施工方法
LIU XIAOWEN (Autor:in) / HUANG HE (Autor:in)
25.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Large-diameter rock-socketed single pile grouting bottoming implementation method
Europäisches Patentamt | 2022
|