Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipe gallery installation scaffold assembly structure
The invention discloses a pipe gallery installation scaffold assembly structure. The pipe gallery installation scaffold assembly structure comprises four first supporting rods, the bottom outer wallsof the four first supporting rods are fixedly provided with four fixed plates through bolts correspondingly, the outer walls of one sides of the four fixed plates are connected with four brake rods through bearings correspondingly, the bottom outer walls of the four fixed plates are all fixedly provided with two connection plates through bolts correspondingly, and one sides of the two connection plates are connected with four universal wheels through bearings correspondingly, one ends of the four brake rods are connected to one sides of the four universal wheels through bearings correspondingly, and the outer walls of one sides of the four first supporting rods are fixedly provided with two fixed supports through bolts correspondingly. According to the pipe gallery installation scaffold assembly structure, by means of the arrangements of rubber pads, baffles, sliding rails, stretching and contracting rods and buffer springs, the height of a scaffold can be adjusted when the scaffold isassembled, the scaffold is made to be capable of being suitable for different work environments, and meanwhile, the rubber pads and the buffer springs perform a buffering effect.
本发明公开了一种管廊安装用脚手架拼装结构,包括四个第一支撑杆,四个所述第一支撑杆底部外壁分别通过螺栓固定有四个固定板,四个所述固定板一侧外壁分别通过轴承连接有四个刹车杆,四个所述固定板底部外壁均通过螺栓固定有两个连接板,且两个连接板一侧分别通过轴承连接有四个万向轮,四个所述刹车杆一端分别通过轴承连接在四个万向轮一侧,四个所述第一支撑杆一侧外壁分别通过螺栓固定有两个固定支架。本发明通过设置有橡胶垫、挡板、滑轨、伸缩杆和缓冲弹簧,可以在对脚手架进行拼装时,调整脚手架的高度,使得能够适用于不同的工作环境,同时橡胶垫和缓冲弹簧起到了缓冲的效果。
Pipe gallery installation scaffold assembly structure
The invention discloses a pipe gallery installation scaffold assembly structure. The pipe gallery installation scaffold assembly structure comprises four first supporting rods, the bottom outer wallsof the four first supporting rods are fixedly provided with four fixed plates through bolts correspondingly, the outer walls of one sides of the four fixed plates are connected with four brake rods through bearings correspondingly, the bottom outer walls of the four fixed plates are all fixedly provided with two connection plates through bolts correspondingly, and one sides of the two connection plates are connected with four universal wheels through bearings correspondingly, one ends of the four brake rods are connected to one sides of the four universal wheels through bearings correspondingly, and the outer walls of one sides of the four first supporting rods are fixedly provided with two fixed supports through bolts correspondingly. According to the pipe gallery installation scaffold assembly structure, by means of the arrangements of rubber pads, baffles, sliding rails, stretching and contracting rods and buffer springs, the height of a scaffold can be adjusted when the scaffold isassembled, the scaffold is made to be capable of being suitable for different work environments, and meanwhile, the rubber pads and the buffer springs perform a buffering effect.
本发明公开了一种管廊安装用脚手架拼装结构,包括四个第一支撑杆,四个所述第一支撑杆底部外壁分别通过螺栓固定有四个固定板,四个所述固定板一侧外壁分别通过轴承连接有四个刹车杆,四个所述固定板底部外壁均通过螺栓固定有两个连接板,且两个连接板一侧分别通过轴承连接有四个万向轮,四个所述刹车杆一端分别通过轴承连接在四个万向轮一侧,四个所述第一支撑杆一侧外壁分别通过螺栓固定有两个固定支架。本发明通过设置有橡胶垫、挡板、滑轨、伸缩杆和缓冲弹簧,可以在对脚手架进行拼装时,调整脚手架的高度,使得能够适用于不同的工作环境,同时橡胶垫和缓冲弹簧起到了缓冲的效果。
Pipe gallery installation scaffold assembly structure
一种管廊安装用脚手架拼装结构
LI DONGSHENG (Autor:in) / LI LIANG (Autor:in) / WU LIYING (Autor:in)
25.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Modularized installation method for steel structure pipe gallery
Europäisches Patentamt | 2024
|Pipe gallery segment installation construction system
Europäisches Patentamt | 2024
|Pipe gallery prefabricated installation construction method
Europäisches Patentamt | 2020
|