Modularized installation method for steel structure pipe gallery
The invention discloses a modular mounting method for a steel structure pipe gallery, which comprises the following steps of: S101, hoisting a vertical column, firstly performing measurement preparation, setting out measurement after safety measures are hung, then mounting an anchor rod leveling nut and a cushion block, and then hoisting the vertical column; s102, upright post correction: after the upright post hoisting is completed, the upright post is measured and corrected; s103, a main steel beam is installed, hanging safety measures are taken firstly, and then hoisting installation of the main steel beam is completed; s104, the steel beam is corrected, and after hoisting is completed, the steel beam is corrected; s105, high-strength bolt construction is conducted, when any unit stand column and a steel beam are installed, the stand columns are corrected firstly, and after the steel beam between the stand columns is adjusted and corrected, bolts on all nodes are tightened, so that connecting plates at all the nodes are attached well, and the installation requirements of the bolts are met; s106, stand column-stand column welding is conducted, and welding between stand columns is completed; s107, beam-stand column welding is conducted, and welding between the stand column and the steel beam is completed; s108, detection is conducted, specifically, the appearance of the weld joint is checked; and S109, transferring to the next unit after the inspection is qualified.
本发明公开了一种钢结构管廊模块化安装方法,S101.立柱吊装,先进行测量准备,挂设好安全措施后,进行测量放线,然后安装锚杆调平螺帽及垫块,之后将立柱进行吊装;S102.立柱矫正,完成立柱吊装后,对立柱进行测量和矫正;S103.主钢梁安装,先进行挂设安全措施,然后完成主钢梁吊装安装;S104.钢梁矫正,完成吊装后,对钢梁进行矫正;S105.高强螺栓施工,在任何一个单元立柱与钢梁安装时,先校正立柱,立柱间钢梁调整校正完毕后,将各节点上螺栓拧紧,使各节点处的连接板贴合好,以保证螺栓的安装要求;S106.立柱‑立柱焊接,完成立柱和立柱之间的焊接;S107.梁‑立柱焊接,完成立柱和钢梁之间的焊接;S108.检测,对焊缝外观进行检查;S109.检查合格后转入下一单元。
Modularized installation method for steel structure pipe gallery
The invention discloses a modular mounting method for a steel structure pipe gallery, which comprises the following steps of: S101, hoisting a vertical column, firstly performing measurement preparation, setting out measurement after safety measures are hung, then mounting an anchor rod leveling nut and a cushion block, and then hoisting the vertical column; s102, upright post correction: after the upright post hoisting is completed, the upright post is measured and corrected; s103, a main steel beam is installed, hanging safety measures are taken firstly, and then hoisting installation of the main steel beam is completed; s104, the steel beam is corrected, and after hoisting is completed, the steel beam is corrected; s105, high-strength bolt construction is conducted, when any unit stand column and a steel beam are installed, the stand columns are corrected firstly, and after the steel beam between the stand columns is adjusted and corrected, bolts on all nodes are tightened, so that connecting plates at all the nodes are attached well, and the installation requirements of the bolts are met; s106, stand column-stand column welding is conducted, and welding between stand columns is completed; s107, beam-stand column welding is conducted, and welding between the stand column and the steel beam is completed; s108, detection is conducted, specifically, the appearance of the weld joint is checked; and S109, transferring to the next unit after the inspection is qualified.
本发明公开了一种钢结构管廊模块化安装方法,S101.立柱吊装,先进行测量准备,挂设好安全措施后,进行测量放线,然后安装锚杆调平螺帽及垫块,之后将立柱进行吊装;S102.立柱矫正,完成立柱吊装后,对立柱进行测量和矫正;S103.主钢梁安装,先进行挂设安全措施,然后完成主钢梁吊装安装;S104.钢梁矫正,完成吊装后,对钢梁进行矫正;S105.高强螺栓施工,在任何一个单元立柱与钢梁安装时,先校正立柱,立柱间钢梁调整校正完毕后,将各节点上螺栓拧紧,使各节点处的连接板贴合好,以保证螺栓的安装要求;S106.立柱‑立柱焊接,完成立柱和立柱之间的焊接;S107.梁‑立柱焊接,完成立柱和钢梁之间的焊接;S108.检测,对焊缝外观进行检查;S109.检查合格后转入下一单元。
Modularized installation method for steel structure pipe gallery
一种钢结构管廊模块化安装方法
SHAO XIAOHUA (Autor:in) / LI BIN (Autor:in) / PENG XINXIN (Autor:in) / LING GUANYU (Autor:in)
25.06.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Pipe gallery installation scaffold assembly structure
Europäisches Patentamt | 2020
|Modularized installation method for steel structure industrial building
Europäisches Patentamt | 2022
|Modularized underground comprehensive pipe gallery ventilation opening and assembling method thereof
Europäisches Patentamt | 2022
|