The invention discloses an open pit mine steep slope ecological restoration structure and a restoration method, and particularly relates to the technical field of ecological restoration and land reclamation. The open pit mine steep slope ecological restoration structure comprises first vegetation bags located on the top and the bottom of a slope. A steel wire net and vine plants are laid at the position, between the two first vegetation bags, of the slope. Anchors are arranged between the steel wire net and the slope. Nutrient soil is laid below the vegetation bag at the bottom of the slope. The vine plants are arranged on the nutrient soil. A second vegetation bag is arranged on one side of the nutrient soil, retaining walls are arranged on one side of the second vegetation bag at intervals, the positions between the retaining walls and the second vegetation bag are filled with planting soil, and vegetation is arranged on the planting soil. By the adoption of the technical scheme, theproblem that an existing mine slope cannot retain water and nutrients in soil, so that the vegetation dies off is solved, and the open pit mine steep slope ecological restoration structure and the restoration method can be used for large-gradient slope restoration.
本发明专利公开了一种露天矿山陡坡生态修复结构及修复方法,具体涉及生态修复和土地复垦的技术领域。一种露天矿山陡坡生态修复结构,包括位于边坡顶部和底部的第一植生袋,两个所述第一植生袋之间的边坡上铺设有钢丝网和藤本植物,所述钢丝网与边坡之间设有锚钉,所述边坡底部的植生袋下方铺设有营养土,所述营养土上设有藤本植物,所述营养土一侧设有第二植生袋,所述第二植生袋一侧间隔设有挡墙,所述挡墙与第二植生袋之间填充有耕植土,所述耕植土上设有植被。采用本发明技术方案现有的矿山边坡无法留住土壤中的水分与营养物而导致植被枯死的问题,可用于大坡度的边坡修复。
The invention discloses an open pit mine steep slope ecological restoration structure and a restoration method, and particularly relates to the technical field of ecological restoration and land reclamation. The open pit mine steep slope ecological restoration structure comprises first vegetation bags located on the top and the bottom of a slope. A steel wire net and vine plants are laid at the position, between the two first vegetation bags, of the slope. Anchors are arranged between the steel wire net and the slope. Nutrient soil is laid below the vegetation bag at the bottom of the slope. The vine plants are arranged on the nutrient soil. A second vegetation bag is arranged on one side of the nutrient soil, retaining walls are arranged on one side of the second vegetation bag at intervals, the positions between the retaining walls and the second vegetation bag are filled with planting soil, and vegetation is arranged on the planting soil. By the adoption of the technical scheme, theproblem that an existing mine slope cannot retain water and nutrients in soil, so that the vegetation dies off is solved, and the open pit mine steep slope ecological restoration structure and the restoration method can be used for large-gradient slope restoration.
本发明专利公开了一种露天矿山陡坡生态修复结构及修复方法,具体涉及生态修复和土地复垦的技术领域。一种露天矿山陡坡生态修复结构,包括位于边坡顶部和底部的第一植生袋,两个所述第一植生袋之间的边坡上铺设有钢丝网和藤本植物,所述钢丝网与边坡之间设有锚钉,所述边坡底部的植生袋下方铺设有营养土,所述营养土上设有藤本植物,所述营养土一侧设有第二植生袋,所述第二植生袋一侧间隔设有挡墙,所述挡墙与第二植生袋之间填充有耕植土,所述耕植土上设有植被。采用本发明技术方案现有的矿山边坡无法留住土壤中的水分与营养物而导致植被枯死的问题,可用于大坡度的边坡修复。
Open pit mine steep slope ecological restoration structure and restoration method
一种露天矿山陡坡生态修复结构及修复方法
YANG HAO (Autor:in)
28.08.2020
Patent
Elektronische Ressource
Chinesisch
Waste mine steep slope ecological restoration structure and restoration method
Europäisches Patentamt | 2021
|Ecological restoration method for high and steep slope of surface mine
Europäisches Patentamt | 2022
|Ecological restoration method for high and steep step slope of open-pit quarrying mine
Europäisches Patentamt | 2020
|Sustainable ecological restoration structure and method for steep slope
Europäisches Patentamt | 2024
|