Construction method for laying interlocking block soft mattress in upper-beach shallow end under low water level
The invention provides a construction method for laying interlocking block soft mattress in an upper-beach shallow end under a low water level. The construction method comprises the steps of binding concrete interlocking blocks on an arrangement boat to make the soft mattress, arranging traction equipment on a bank slope, making a traction rope connected with the traction equipment and a tractionsteel beam, using a polypropylene rope to bind the traction steel beam and the soft mattress bond with the concrete interlocking blocks, and then pulling the soft mattress on the arrangement boat to adesigned position of the upper-beach shallow end through the pulling equipment to achieve laying construction of the soft mattress of the upper-beach shallow end under a low water level at a time. Compared with the prior art, the construction method solves the problems in the prior art that under a low water level, mat arrangement of the upper-beach shallow end under the low water level and the placement of concrete interlocking blocks are separately conducted, and the soft mattress cannot be laid as a whole; and meanwhile, the construction method has the advantages of being safe in construction, high in quality and efficiency and the like.
本发明提供一种低水位下高滩浅水区铺设联锁块软体排的施工方法,是在铺排船上绑扎混凝土联锁块制做软体排,在岸坡上设置牵引设备,牵引缆绳连接牵引设备与牵引钢梁,牵引钢梁与绑扎好混凝土联锁块的软体排之间使用丙纶绳绑扎,进而通过牵引设备牵引铺排船上的软体排至高滩浅水区的设计位置,实现低水位下高滩浅水区软体排一次性铺设施工作业。与现有技术相比,本发明克服了以往低水位下高滩浅水区域排垫与混凝土联锁块安放分开作业,无法整体铺设软体排施工的问题,具有施工安全、质量好、效率高等优点。
Construction method for laying interlocking block soft mattress in upper-beach shallow end under low water level
The invention provides a construction method for laying interlocking block soft mattress in an upper-beach shallow end under a low water level. The construction method comprises the steps of binding concrete interlocking blocks on an arrangement boat to make the soft mattress, arranging traction equipment on a bank slope, making a traction rope connected with the traction equipment and a tractionsteel beam, using a polypropylene rope to bind the traction steel beam and the soft mattress bond with the concrete interlocking blocks, and then pulling the soft mattress on the arrangement boat to adesigned position of the upper-beach shallow end through the pulling equipment to achieve laying construction of the soft mattress of the upper-beach shallow end under a low water level at a time. Compared with the prior art, the construction method solves the problems in the prior art that under a low water level, mat arrangement of the upper-beach shallow end under the low water level and the placement of concrete interlocking blocks are separately conducted, and the soft mattress cannot be laid as a whole; and meanwhile, the construction method has the advantages of being safe in construction, high in quality and efficiency and the like.
本发明提供一种低水位下高滩浅水区铺设联锁块软体排的施工方法,是在铺排船上绑扎混凝土联锁块制做软体排,在岸坡上设置牵引设备,牵引缆绳连接牵引设备与牵引钢梁,牵引钢梁与绑扎好混凝土联锁块的软体排之间使用丙纶绳绑扎,进而通过牵引设备牵引铺排船上的软体排至高滩浅水区的设计位置,实现低水位下高滩浅水区软体排一次性铺设施工作业。与现有技术相比,本发明克服了以往低水位下高滩浅水区域排垫与混凝土联锁块安放分开作业,无法整体铺设软体排施工的问题,具有施工安全、质量好、效率高等优点。
Construction method for laying interlocking block soft mattress in upper-beach shallow end under low water level
一种低水位下高滩浅水区铺设联锁块软体排的施工方法
CHEN YIMEI (Autor:in) / LI JINGJING (Autor:in) / JIN JIAN (Autor:in) / MA WENTAI (Autor:in) / YU SONGLIN (Autor:in) / LI XIANGWEI (Autor:in) / QIAN MING (Autor:in) / LI ZHIPENG (Autor:in) / WANG XIAO (Autor:in) / XIA LUNLIANG (Autor:in)
08.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Concrete interlocking block soft mattress connecting and laying construction method
Europäisches Patentamt | 2021
|Floating pipe sand blowing soft mattress laying method
Europäisches Patentamt | 2023
|Interlocking type ecological beach protection block and beach protection structure adopting block
Europäisches Patentamt | 2021
|