Transporting and erecting integrated method for prefabricated pier segment blocks
The invention discloses a transporting and erecting integrated method for prefabricated pier segment blocks. Transporting and erecting equipment used in the method is called as a transporting and erecting integrated machine for short. The method comprises the following steps that: A, a prefabricated pier segment block is loaded; B, the prefabricated pier segment block is transported; C, the posture of the transporting and erecting integrated machine is adjusted; D, the prefabricated pier segment block is erected; E, the step A to the step D are repeated till transportation and erection construction of the remaining prefabricated pier segment blocks are completed. According to the method, prefabricated pier assembly type construction is certainly promoted to be developed towards the green,factory-like and standardized construction direction, and economic, social and environmental benefits are increasingly remarkable.
本发明公开了一种预制桥墩节段块运输架设一体式方法,将本方法中使用的运输架设设备简称为运架一体机,包括如下步骤:步骤A:预制桥墩节段块的装载;步骤B:预制桥墩节段块的运输;步骤C:运架一体机的姿态调整;步骤D:预制桥墩节段块的架设;步骤E:重复步骤A至步骤D直至完成剩余预制桥墩节段块的运输及架设施工;该方法必将推动预制桥墩装配式施工向绿色化、工厂化、标准化施工方向发展,其经济、社会、环境效益将日益显著。
Transporting and erecting integrated method for prefabricated pier segment blocks
The invention discloses a transporting and erecting integrated method for prefabricated pier segment blocks. Transporting and erecting equipment used in the method is called as a transporting and erecting integrated machine for short. The method comprises the following steps that: A, a prefabricated pier segment block is loaded; B, the prefabricated pier segment block is transported; C, the posture of the transporting and erecting integrated machine is adjusted; D, the prefabricated pier segment block is erected; E, the step A to the step D are repeated till transportation and erection construction of the remaining prefabricated pier segment blocks are completed. According to the method, prefabricated pier assembly type construction is certainly promoted to be developed towards the green,factory-like and standardized construction direction, and economic, social and environmental benefits are increasingly remarkable.
本发明公开了一种预制桥墩节段块运输架设一体式方法,将本方法中使用的运输架设设备简称为运架一体机,包括如下步骤:步骤A:预制桥墩节段块的装载;步骤B:预制桥墩节段块的运输;步骤C:运架一体机的姿态调整;步骤D:预制桥墩节段块的架设;步骤E:重复步骤A至步骤D直至完成剩余预制桥墩节段块的运输及架设施工;该方法必将推动预制桥墩装配式施工向绿色化、工厂化、标准化施工方向发展,其经济、社会、环境效益将日益显著。
Transporting and erecting integrated method for prefabricated pier segment blocks
一种预制桥墩节段块运输架设一体式方法
ZHANG ZHIHUA (Autor:in) / CAO CHANGXING (Autor:in) / LU GUANNAN (Autor:in) / CHEN DELI (Autor:in) / XIAO XIANGRONG (Autor:in) / DAI YU (Autor:in) / YANG WEIPING (Autor:in) / CHEN HAO (Autor:in) / ZHU ANBAO (Autor:in) / YU SHIGU (Autor:in)
15.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
/
B60P
Fahrzeuge zum Transport von Lasten oder zum Befördern, Tragen oder Aufnehmen besonderer Lasten oder Gegenstände
,
VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
/
B62D
MOTOR VEHICLES
,
Motorfahrzeuge
/
B66C
Krane
,
CRANES
Prefabricated pier erecting device, erecting method and obstacle crossing method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Anti-seismic prefabricated segment assembly pier connecting device
Europäisches Patentamt | 2024
|Bridge erecting machine for pier-beam integrated construction
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|