Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Super-long pile casing construction system and method of underwater pier and pile integrated process
The invention belongs to the technical field of bridge pier pile construction. A super-long pile casing construction system for an underwater pier and pile integrated process comprises a constructionplatform, a guide frame, an adjusting device, hoisting equipment and a floating ball. The guide frame is arranged on the construction platform and corresponds to a pier and pile to be constructed, andthe guide frame is used for positioning and guiding a pile casing; the adjusting device is arranged on the guide frame and is used for correcting, locking and fixing the pile casing; the hoisting equipment is used for hoisting the pile casing and lowering the pile casing; a pull rope is tied to the floating ball, and the lower end of the pull rope is fixed to the center of the bottom of the pilecasing; and when the bottom of the pile casing is landed, the floating ball is located on a water surface in the pile casing and does not float out of the water surface. The invention further discloses a super-long pile casing construction method of the underwater pier and pile integrated process. The system is reasonable in structural design and convenient to construct, perpendicularity of the super-long pile casing can be effectively measured and corrected, and the perpendicularity of the pile casing is guaranteed, and the construction quality of a bridge pier pile is guaranteed.
本发明属于桥梁墩桩柱施工技术领域。一种水中墩桩柱一体工艺的超长护筒施工系统,包括施工平台、导向架、调整装置、吊运设备和浮球,导向架设置在施工平台上并与待施工的墩桩柱相对应,且导向架用于对护筒进行定位导向;调整装置设置在导向架上,调整装置用于所述护筒的纠偏和锁止固定;吊运设备用于护筒的吊运和护筒的下放;浮球上系有拉绳,拉绳的下端固定在护筒的底部中心处;当护筒的底部着床时,浮球位于护筒内的水面处,但不浮出水面。还公开了一种水中墩桩柱一体工艺的超长护筒施工方法。本申请结构设计合理,施工方便,能够对超长护筒的垂直度进行有效的测量和纠偏,从而保障护筒的垂直度,保障桥梁墩桩柱的施工质量。
Super-long pile casing construction system and method of underwater pier and pile integrated process
The invention belongs to the technical field of bridge pier pile construction. A super-long pile casing construction system for an underwater pier and pile integrated process comprises a constructionplatform, a guide frame, an adjusting device, hoisting equipment and a floating ball. The guide frame is arranged on the construction platform and corresponds to a pier and pile to be constructed, andthe guide frame is used for positioning and guiding a pile casing; the adjusting device is arranged on the guide frame and is used for correcting, locking and fixing the pile casing; the hoisting equipment is used for hoisting the pile casing and lowering the pile casing; a pull rope is tied to the floating ball, and the lower end of the pull rope is fixed to the center of the bottom of the pilecasing; and when the bottom of the pile casing is landed, the floating ball is located on a water surface in the pile casing and does not float out of the water surface. The invention further discloses a super-long pile casing construction method of the underwater pier and pile integrated process. The system is reasonable in structural design and convenient to construct, perpendicularity of the super-long pile casing can be effectively measured and corrected, and the perpendicularity of the pile casing is guaranteed, and the construction quality of a bridge pier pile is guaranteed.
本发明属于桥梁墩桩柱施工技术领域。一种水中墩桩柱一体工艺的超长护筒施工系统,包括施工平台、导向架、调整装置、吊运设备和浮球,导向架设置在施工平台上并与待施工的墩桩柱相对应,且导向架用于对护筒进行定位导向;调整装置设置在导向架上,调整装置用于所述护筒的纠偏和锁止固定;吊运设备用于护筒的吊运和护筒的下放;浮球上系有拉绳,拉绳的下端固定在护筒的底部中心处;当护筒的底部着床时,浮球位于护筒内的水面处,但不浮出水面。还公开了一种水中墩桩柱一体工艺的超长护筒施工方法。本申请结构设计合理,施工方便,能够对超长护筒的垂直度进行有效的测量和纠偏,从而保障护筒的垂直度,保障桥梁墩桩柱的施工质量。
Super-long pile casing construction system and method of underwater pier and pile integrated process
水中墩桩柱一体工艺的超长护筒施工系统及方法
WANG CHUN (Autor:in) / FAN YUERANG (Autor:in) / SUN LEI (Autor:in) / FU LEI (Autor:in) / SHI SHAOYAN (Autor:in) / WANG XIUPING (Autor:in) / REN CHANGMING (Autor:in)
15.09.2020
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Underwater pile foundation pile casing anchoring method
Europäisches Patentamt | 2023
|Long spiral drilling pressure grouting pile construction pile casing and construction process
Europäisches Patentamt | 2020
|Underwater full pile casing rock-socketed cast-in-place pile construction method
Europäisches Patentamt | 2023
|