Super-long double-pile-casing structure for test pile detection and construction method of super-long double-pile-casing structure
The invention discloses an ultra-long double-pile-casing structure for test pile detection and a construction method of the ultra-long double-pile-casing structure. The ultra-long double-pile-casing structure for test pile detection comprises a first section and a second section, and the first section and the second section are connected in a spliced mode; the difficulty of transportation and construction site splicing is reduced through the maximum curing design of the product, the construction difficulty is reduced through the design of the connecting section of the double-pile-casing structure, the installation precision of the double pile casings is higher, and the situation that the inner pile casings and the outer pile casings are not concentric in the double-pile-casing site splicing process, and consequently the inner pile casings and the outer pile casings are adhered is avoided; and the experimental data is not accurate. The construction method of the ultra-long double-pile-casing structure for test pile detection is simple in construction and high in installation precision.
本发明公开了一种用于试验桩检测的超长双护筒结构及其施工方法,该用于试验桩检测的超长双护筒结构包括分节一和分节二,分节一和分节二拼接连接;通过对产品最大程度的固化设计,减少运输和施工现场拼装的难度,通过对双护筒结构连接段的设计,减少施工难度,使得双护筒的安装精度更高,避免双护筒现场拼接过程中内外护筒不同心,导致的内外护筒粘连,进而导致实验数据不准确的情况。本发明用于试验桩检测的超长双护筒结构的施工方法施工简单,安装精度高。
Super-long double-pile-casing structure for test pile detection and construction method of super-long double-pile-casing structure
The invention discloses an ultra-long double-pile-casing structure for test pile detection and a construction method of the ultra-long double-pile-casing structure. The ultra-long double-pile-casing structure for test pile detection comprises a first section and a second section, and the first section and the second section are connected in a spliced mode; the difficulty of transportation and construction site splicing is reduced through the maximum curing design of the product, the construction difficulty is reduced through the design of the connecting section of the double-pile-casing structure, the installation precision of the double pile casings is higher, and the situation that the inner pile casings and the outer pile casings are not concentric in the double-pile-casing site splicing process, and consequently the inner pile casings and the outer pile casings are adhered is avoided; and the experimental data is not accurate. The construction method of the ultra-long double-pile-casing structure for test pile detection is simple in construction and high in installation precision.
本发明公开了一种用于试验桩检测的超长双护筒结构及其施工方法,该用于试验桩检测的超长双护筒结构包括分节一和分节二,分节一和分节二拼接连接;通过对产品最大程度的固化设计,减少运输和施工现场拼装的难度,通过对双护筒结构连接段的设计,减少施工难度,使得双护筒的安装精度更高,避免双护筒现场拼接过程中内外护筒不同心,导致的内外护筒粘连,进而导致实验数据不准确的情况。本发明用于试验桩检测的超长双护筒结构的施工方法施工简单,安装精度高。
Super-long double-pile-casing structure for test pile detection and construction method of super-long double-pile-casing structure
一种用于试验桩检测的超长双护筒结构及其施工方法
CHEN MING (Autor:in) / DANG ZHIRONG (Autor:in) / ZHAI KONGKANG (Autor:in) / WANG KAI (Autor:in) / YU YANGYANG (Autor:in) / LI JIA (Autor:in)
01.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Double-casing all-slewing super-long pile construction tool and construction method
Europäisches Patentamt | 2020
|Ultra-long double-pile-casing structure for uplift test pile detection and using method thereof
Europäisches Patentamt | 2024
|Super-long pile casing construction system and method of underwater pier and pile integrated process
Europäisches Patentamt | 2020
|Device and method for pulling out super-long pile foundation concrete pile casing
Europäisches Patentamt | 2024
|