Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile shoe bottom sealing system and sealing method for post-pile method construction
The invention belongs to the technical field of ocean engineering construction, and particularly relates to a pile shoe bottom sealing system and sealing method for post-pile method construction. Thesystem comprises a jacket foundation arranged on a seabed, pile shoes arranged around the lower end of the jacket foundation and a plurality of steel pipe piles inserted into the seabed, wherein the steel pipe piles are inserted into the corresponding pile shoes, diaphragms are arranged at the bottoms of the pile shoes, first sealing partition strips, steel wire brushes and second sealing partition strips are arranged between the pile shoes and the steel pipe piles in an up-down mode, gaps between the pile shoes and the steel pipe piles are vertically separated into first containing cavities and second containing cavities through the first sealing partition strips and the second sealing partition strips, the first containing cavities are filled with expanded high polymers, and the second containing cavities are filled with concrete. According to the system, the expanded high polymers are used for pouring sealing between the jacket foundation pile shoes and the steel pipe piles, and thegood sealing effect and plugging effect are achieved.
本发明属于海洋工程施工技术领域,具体涉及一种用于后桩法施工的桩靴底部密封系统及其密封系统,包括安置于海床上的导管架基础、设置于导管架基础下端周围的桩靴及若干插入海床的钢管桩,钢管桩插接于对应桩靴中,桩靴的底部设置隔膜,桩靴与钢管桩之间上下设置第一密封隔条、钢丝毛刷及第二密封隔条,第一密封隔条和第二密封隔条将桩靴与钢管桩之间的缝隙上下分隔成第一容腔和第二容腔,第一容腔内填满膨胀高聚物,第二容腔内填满混凝土。本发明利用膨胀高聚物进行导管架基础桩靴与钢管桩之间的灌注密封,具有良好的密封效果与堵漏效果。
Pile shoe bottom sealing system and sealing method for post-pile method construction
The invention belongs to the technical field of ocean engineering construction, and particularly relates to a pile shoe bottom sealing system and sealing method for post-pile method construction. Thesystem comprises a jacket foundation arranged on a seabed, pile shoes arranged around the lower end of the jacket foundation and a plurality of steel pipe piles inserted into the seabed, wherein the steel pipe piles are inserted into the corresponding pile shoes, diaphragms are arranged at the bottoms of the pile shoes, first sealing partition strips, steel wire brushes and second sealing partition strips are arranged between the pile shoes and the steel pipe piles in an up-down mode, gaps between the pile shoes and the steel pipe piles are vertically separated into first containing cavities and second containing cavities through the first sealing partition strips and the second sealing partition strips, the first containing cavities are filled with expanded high polymers, and the second containing cavities are filled with concrete. According to the system, the expanded high polymers are used for pouring sealing between the jacket foundation pile shoes and the steel pipe piles, and thegood sealing effect and plugging effect are achieved.
本发明属于海洋工程施工技术领域,具体涉及一种用于后桩法施工的桩靴底部密封系统及其密封系统,包括安置于海床上的导管架基础、设置于导管架基础下端周围的桩靴及若干插入海床的钢管桩,钢管桩插接于对应桩靴中,桩靴的底部设置隔膜,桩靴与钢管桩之间上下设置第一密封隔条、钢丝毛刷及第二密封隔条,第一密封隔条和第二密封隔条将桩靴与钢管桩之间的缝隙上下分隔成第一容腔和第二容腔,第一容腔内填满膨胀高聚物,第二容腔内填满混凝土。本发明利用膨胀高聚物进行导管架基础桩靴与钢管桩之间的灌注密封,具有良好的密封效果与堵漏效果。
Pile shoe bottom sealing system and sealing method for post-pile method construction
一种用于后桩法施工的桩靴底部密封系统及其密封方法
ZHU RONGHUA (Autor:in) / WANG LIZHONG (Autor:in) / WANG HENGFENG (Autor:in) / QIN QI (Autor:in) / LU CHENGLI (Autor:in) / LIU DONGHUA (Autor:in) / ZHENG RONGKUN (Autor:in)
15.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Bottom-sealing-free pile tip for pipe pile construction
Europäisches Patentamt | 2022
|Underwater reverse bottom sealing hollow pile construction method
Europäisches Patentamt | 2023
|Precast tubular pile core foam polyurethane rapid bottom sealing construction method
Europäisches Patentamt | 2020
|