Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge deck and pier connecting method of prefabricated bridge
The invention relates to a bridge deck and pier connecting method for a prefabricated bridge, which comprises the following steps of: 1, an upper assembly hole is formed in a bridge deck, a lower assembly hole is formed in a pier, and a rubber support rod is made; 2, the lower end of a rubber supporting rod is arranged in the corresponding assembling hole in a penetrating mode; 3, the bridge deckis fixed to the upper portions of the bridge piers in a liftable mode; 4, the upper end of a rubber supporting rod is arranged in the upper assembling hole in a penetrating mode; 5, a lower hooking rod is in lap joint with the lower assembling hole annular cover, and an upper hooking rod is in lap joint with the upper assembling hole annular cover; 6, concrete is poured into the upper assembling hole, and concrete is poured into the lower assembling hole; 7, after the concrete in the upper assembling hole and the concrete in the lower assembling hole are solidified, the supporting structure isremoved. The invention provides a bridge deck pier connecting method of a prefabricated bridge. The problem that the vibration isolation effect between existing fabricated concrete structure layers is poor is solved.
本发明涉及一种预制桥的桥板桥墩连接方法,第一步、在桥板设置上装配孔,在桥墩上设置下装配孔,制作橡胶支撑杆;第二步、将橡胶支撑杆的下端穿设到相装配孔内;第三步、将桥板可升降地固定在桥墩上方;第四步、将橡胶支撑杆的上端穿设到上装配孔内;第五步、使下钩接杆搭接在下装配孔环形盖上和上钩接杆搭接在上装配孔环形盖上;第六步、在上装配孔内浇筑混凝土,在下装配孔内浇筑混凝土;第七步、当上装配孔内的混凝土和下装配孔内的混凝土都固化后将所述支撑结构拆除。本发明提供了一种预制桥的桥板桥墩连接方法,解决了现有的装配式混凝土结构层间之间的隔振效果差的问题。
Bridge deck and pier connecting method of prefabricated bridge
The invention relates to a bridge deck and pier connecting method for a prefabricated bridge, which comprises the following steps of: 1, an upper assembly hole is formed in a bridge deck, a lower assembly hole is formed in a pier, and a rubber support rod is made; 2, the lower end of a rubber supporting rod is arranged in the corresponding assembling hole in a penetrating mode; 3, the bridge deckis fixed to the upper portions of the bridge piers in a liftable mode; 4, the upper end of a rubber supporting rod is arranged in the upper assembling hole in a penetrating mode; 5, a lower hooking rod is in lap joint with the lower assembling hole annular cover, and an upper hooking rod is in lap joint with the upper assembling hole annular cover; 6, concrete is poured into the upper assembling hole, and concrete is poured into the lower assembling hole; 7, after the concrete in the upper assembling hole and the concrete in the lower assembling hole are solidified, the supporting structure isremoved. The invention provides a bridge deck pier connecting method of a prefabricated bridge. The problem that the vibration isolation effect between existing fabricated concrete structure layers is poor is solved.
本发明涉及一种预制桥的桥板桥墩连接方法,第一步、在桥板设置上装配孔,在桥墩上设置下装配孔,制作橡胶支撑杆;第二步、将橡胶支撑杆的下端穿设到相装配孔内;第三步、将桥板可升降地固定在桥墩上方;第四步、将橡胶支撑杆的上端穿设到上装配孔内;第五步、使下钩接杆搭接在下装配孔环形盖上和上钩接杆搭接在上装配孔环形盖上;第六步、在上装配孔内浇筑混凝土,在下装配孔内浇筑混凝土;第七步、当上装配孔内的混凝土和下装配孔内的混凝土都固化后将所述支撑结构拆除。本发明提供了一种预制桥的桥板桥墩连接方法,解决了现有的装配式混凝土结构层间之间的隔振效果差的问题。
Bridge deck and pier connecting method of prefabricated bridge
预制桥的桥板桥墩连接方法
18.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge plate pier connecting structure of prefabricated bridge
Europäisches Patentamt | 2020
Europäisches Patentamt | 2021
|Prefabricated bridge deck slab wet joint connecting structure, prefabricated bridge and method
Europäisches Patentamt | 2020
|Connecting hinge suitable for prefabricated assembled bridge pier
Europäisches Patentamt | 2021
|Welding stud connecting structure of prefabricated bridge pier
Europäisches Patentamt | 2023
|