Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of novel assembling holding pole
The invention relates to a construction method of a novel assembling holding pole, and belongs to the technical field of electric machinery construction. The construction method specifically comprisesthe following steps: arranging a construction site: conveying each part of the holding pole, a mechanism, a steel wire rope and the like to a designated construction position; transporting an underframe foundation to the processed ground, and setting a pull wire; mounting a jacking sleeve frame and jacking oil cylinders; sequentially introducing tower top sections, an upper support rotating support, a lower support rotating support, standard sections, a transition section and the like through an introduction trolley; and hanging suspension arms to an installation position through an opening 500 and connecting through a pin shaft. According to the construction method, the construction efficiency can be effectively improved, the cost is saved, and the waste of resources is reduced.
本发明涉及一种新型组立抱杆的施工方法,它属于电力机械施工工艺领域。本发明施工方法具体如下:布置施工现场:将抱杆各部件、机构、钢丝绳等运至指定施工位置;将底架基础运至处理好的地面上,打设好拉线;安装好顶升套架与顶升油缸;通过引进小车依次引进塔顶节,上、下支座回转支撑,标准节,过渡节等;通过口500抱杆将吊臂吊至安装位置,并用销轴连接。本发明施工方法,能够有效的提升施工效率,节约成本,减少资源的浪费。
Construction method of novel assembling holding pole
The invention relates to a construction method of a novel assembling holding pole, and belongs to the technical field of electric machinery construction. The construction method specifically comprisesthe following steps: arranging a construction site: conveying each part of the holding pole, a mechanism, a steel wire rope and the like to a designated construction position; transporting an underframe foundation to the processed ground, and setting a pull wire; mounting a jacking sleeve frame and jacking oil cylinders; sequentially introducing tower top sections, an upper support rotating support, a lower support rotating support, standard sections, a transition section and the like through an introduction trolley; and hanging suspension arms to an installation position through an opening 500 and connecting through a pin shaft. According to the construction method, the construction efficiency can be effectively improved, the cost is saved, and the waste of resources is reduced.
本发明涉及一种新型组立抱杆的施工方法,它属于电力机械施工工艺领域。本发明施工方法具体如下:布置施工现场:将抱杆各部件、机构、钢丝绳等运至指定施工位置;将底架基础运至处理好的地面上,打设好拉线;安装好顶升套架与顶升油缸;通过引进小车依次引进塔顶节,上、下支座回转支撑,标准节,过渡节等;通过口500抱杆将吊臂吊至安装位置,并用销轴连接。本发明施工方法,能够有效的提升施工效率,节约成本,减少资源的浪费。
Construction method of novel assembling holding pole
一种新型组立抱杆的施工方法
JIN HEXIANG (Autor:in) / TONG QI (Autor:in) / LI WEIBO (Autor:in) / YAO CHENGKAI (Autor:in) / ZHOU LIHONG (Autor:in) / ZHANG RUIYANG (Autor:in)
25.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Simple pole assembling tool and pole assembling method therefor
Europäisches Patentamt | 2016
|Internal-suspension arch-shaped stay wire holding pole disassembling and assembling tower
Europäisches Patentamt | 2022
|Holding pole structure for blocking net and holding pole combined net blocking method
Europäisches Patentamt | 2024
|Novel insulating herringbone holding pole erecting device
Europäisches Patentamt | 2020
|