Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of pile foundation concrete grouting guide pipe control device
The invention relates to a construction method of a pile foundation concrete grouting guide pipe control device. Each section of a guide pipe is placed on a sized bracket, the sized bracket is provided with a universal wheel, and the sized bracket can be moved to abut the guide pipe and the abutted guide pipe can be moved integrally, too, so that the construction method is convenient in construction and labor waste and time waste as well insecurity caused by manually carrying the guide pipes are avoided. When the guide pipe is subjected to a watertight test on the sized bracket, the flatness of the sized bracket can be adjusted, so that stress deformation of the guide pipe due to an uneven field is avoided. The position of a movable stop lever can be adjusted by means of a movable hinge and a clamping rod, so that the placing height of the guide pipe is adjusted and the guide pipe is overturned, and therefore, the construction method is convenient and rapid. Water fenders are arrangedon two sides of the sized bracket to prevent chaos of a construction site caused by water spraying in the watertight test.
本发明涉及桩基混凝土灌注导管控制装置的施工方法,每段导管放置在一个定型化支架上,定型化支架带有万向轮,可以移动定型化支架来对接导管,也可以整体移动对接好的导管,施工便捷,避免了采用人工搬动导管的费力费时和不安全性;导管在定型化支架上做水密性试验时可以通过定型化支架调整平整度,避免由于场地不平整造成的导管受力变形;通过活动铰链和卡位杆可以实现调节活动挡杆位置,从而调整导管放置的高度和实现导管的翻转,方便快捷;在定型化支架两侧设置挡水板,可以避免水密性试验时喷水造成工地混乱。
Construction method of pile foundation concrete grouting guide pipe control device
The invention relates to a construction method of a pile foundation concrete grouting guide pipe control device. Each section of a guide pipe is placed on a sized bracket, the sized bracket is provided with a universal wheel, and the sized bracket can be moved to abut the guide pipe and the abutted guide pipe can be moved integrally, too, so that the construction method is convenient in construction and labor waste and time waste as well insecurity caused by manually carrying the guide pipes are avoided. When the guide pipe is subjected to a watertight test on the sized bracket, the flatness of the sized bracket can be adjusted, so that stress deformation of the guide pipe due to an uneven field is avoided. The position of a movable stop lever can be adjusted by means of a movable hinge and a clamping rod, so that the placing height of the guide pipe is adjusted and the guide pipe is overturned, and therefore, the construction method is convenient and rapid. Water fenders are arrangedon two sides of the sized bracket to prevent chaos of a construction site caused by water spraying in the watertight test.
本发明涉及桩基混凝土灌注导管控制装置的施工方法,每段导管放置在一个定型化支架上,定型化支架带有万向轮,可以移动定型化支架来对接导管,也可以整体移动对接好的导管,施工便捷,避免了采用人工搬动导管的费力费时和不安全性;导管在定型化支架上做水密性试验时可以通过定型化支架调整平整度,避免由于场地不平整造成的导管受力变形;通过活动铰链和卡位杆可以实现调节活动挡杆位置,从而调整导管放置的高度和实现导管的翻转,方便快捷;在定型化支架两侧设置挡水板,可以避免水密性试验时喷水造成工地混乱。
Construction method of pile foundation concrete grouting guide pipe control device
桩基混凝土灌注导管控制装置的施工方法
WANG XINQUAN (Autor:in) / CUI YUNLIANG (Autor:in) / DIAO HONGGUO (Autor:in)
29.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
/
G01F
Messen des Volumens, des Durchflussvolumens, des Massendurchflusses oder des Füllstandes
,
MEASURING VOLUME, VOLUME FLOW, MASS FLOW, OR LIQUID LEVEL
/
G01M
TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES
,
Prüfen der statischen oder dynamischen Massenverteilung rotierender Teile von Maschinen oder Konstruktionen
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
Europäisches Patentamt | 2024
|Grouting device and grouting method for pile foundation construction
Europäisches Patentamt | 2021
|Grouting device for post-grouting construction of pile foundation
Europäisches Patentamt | 2024
|Building grouting pile foundation construction method
Europäisches Patentamt | 2015
|Concrete pipe pile post-grouting structure and construction method
Europäisches Patentamt | 2024
|