The invention provides a cast-in-place beam support connecting device and construction process, and relates to the technical field of building construction. The cast-in-place beam support connecting device comprises a plurality of clamping assemblies and a plurality of connecting assemblies, any clamping assembly comprises a clamping plate, and any clamping plate is provided with a first batten plate; the connecting assembly is detachably connected with the first batten plate. Therefore, the connecting device can be conveniently installed on the stand column of the support, and operation is convenient. The cast-in-place beam support construction process comprises the steps that a plurality of stand columns are horizontally placed on the ground, and a plurality of clamping assemblies are installed along the side walls of the stand columns; a foundation is poured on the ground, and the stand columns provided with the clamping assemblies are vertically installed on the foundation; the connecting assembly is installed between every two adjacent stand columns, one end of each connecting assembly is connected with the clamping assembly of one stand column, and the other end of each connecting assembly is connected with the clamping assembly of the other stand column. By adopting the device and the process, the cast-in-place beam support is convenient to install, the erecting time ofthe support is shortened, and the construction progress is accelerated.
本发明提出了一种现浇梁支架连接装置及施工工艺,涉及建筑施工技术领域。一种现浇梁支架连接装置,包括多个卡接组件和多个连接组件,任一卡接组件包括卡接板,任一卡接板设有第一缀板;连接组件与第一缀板可拆卸连接。如此便于将连接装置安装在支架的立柱上,操作方便。一种现浇梁支架施工工艺,包括将多个立柱平放于地面,沿立柱侧壁安装多个卡接组件;在地面浇筑地基,将安装好卡接组件的立柱竖直安装于地基;在相邻两个立柱之间安装连接组件,连接组件的一端与一个立柱的卡接组件连接,连接组件的另一端与另一个立柱的卡接组件连接。采用本发明,便于现浇梁支架的安装,缩短支架的搭设时间,增快施工进度。
The invention provides a cast-in-place beam support connecting device and construction process, and relates to the technical field of building construction. The cast-in-place beam support connecting device comprises a plurality of clamping assemblies and a plurality of connecting assemblies, any clamping assembly comprises a clamping plate, and any clamping plate is provided with a first batten plate; the connecting assembly is detachably connected with the first batten plate. Therefore, the connecting device can be conveniently installed on the stand column of the support, and operation is convenient. The cast-in-place beam support construction process comprises the steps that a plurality of stand columns are horizontally placed on the ground, and a plurality of clamping assemblies are installed along the side walls of the stand columns; a foundation is poured on the ground, and the stand columns provided with the clamping assemblies are vertically installed on the foundation; the connecting assembly is installed between every two adjacent stand columns, one end of each connecting assembly is connected with the clamping assembly of one stand column, and the other end of each connecting assembly is connected with the clamping assembly of the other stand column. By adopting the device and the process, the cast-in-place beam support is convenient to install, the erecting time ofthe support is shortened, and the construction progress is accelerated.
本发明提出了一种现浇梁支架连接装置及施工工艺,涉及建筑施工技术领域。一种现浇梁支架连接装置,包括多个卡接组件和多个连接组件,任一卡接组件包括卡接板,任一卡接板设有第一缀板;连接组件与第一缀板可拆卸连接。如此便于将连接装置安装在支架的立柱上,操作方便。一种现浇梁支架施工工艺,包括将多个立柱平放于地面,沿立柱侧壁安装多个卡接组件;在地面浇筑地基,将安装好卡接组件的立柱竖直安装于地基;在相邻两个立柱之间安装连接组件,连接组件的一端与一个立柱的卡接组件连接,连接组件的另一端与另一个立柱的卡接组件连接。采用本发明,便于现浇梁支架的安装,缩短支架的搭设时间,增快施工进度。
Europäisches Patentamt | 2024
|Sand box device for cast-in-place beam construction and cast-in-place beam construction method
Europäisches Patentamt | 2021
|Cast-in-place box girder support construction process
Europäisches Patentamt | 2020
|Prefabricated column and cast-in-place beam connecting joint structure and construction method
Europäisches Patentamt | 2024
|