Air extraction sleeve gravel pile composite foundation and construction method thereof
The invention provides an air extraction sleeve gravel pile composite foundation and a construction method thereof. The air extraction sleeve gravel pile composite foundation is composed of air extraction sleeve gravel piles and vacuum pre-compressed soil among the piles; each air extraction sleeve gravel pile is composed of a pile body water permeable sleeve system, gravel and a pile cap, and thepile body water permeable sleeve system is formed by inserting a holed steel wire plastic sleeve into a pile body air extraction system; the holed steel wire plastic sleeve are connected through sleeve joints; and the pile body air extraction systems are formed by connecting water permeable pile tips with vertical air extraction pipes.
本发明提供一种抽气套管碎石桩复合地基及其施工方法,所述抽气套管碎石桩复合地基是由抽气套管碎石桩与真空预压后的桩间土组成的;所述的抽气套管碎石桩是由桩身透水套管体系、碎石以及桩帽组成的;所述的桩身透水套管体系是由开孔钢丝塑料套管套入到桩身抽气系统形成的,开孔钢丝塑料套管之间采用套管接头连接;所述桩身抽气系统是由透水桩尖与竖向抽气管连接组成的。
Air extraction sleeve gravel pile composite foundation and construction method thereof
The invention provides an air extraction sleeve gravel pile composite foundation and a construction method thereof. The air extraction sleeve gravel pile composite foundation is composed of air extraction sleeve gravel piles and vacuum pre-compressed soil among the piles; each air extraction sleeve gravel pile is composed of a pile body water permeable sleeve system, gravel and a pile cap, and thepile body water permeable sleeve system is formed by inserting a holed steel wire plastic sleeve into a pile body air extraction system; the holed steel wire plastic sleeve are connected through sleeve joints; and the pile body air extraction systems are formed by connecting water permeable pile tips with vertical air extraction pipes.
本发明提供一种抽气套管碎石桩复合地基及其施工方法,所述抽气套管碎石桩复合地基是由抽气套管碎石桩与真空预压后的桩间土组成的;所述的抽气套管碎石桩是由桩身透水套管体系、碎石以及桩帽组成的;所述的桩身透水套管体系是由开孔钢丝塑料套管套入到桩身抽气系统形成的,开孔钢丝塑料套管之间采用套管接头连接;所述桩身抽气系统是由透水桩尖与竖向抽气管连接组成的。
Air extraction sleeve gravel pile composite foundation and construction method thereof
抽气套管碎石桩复合地基及其施工方法
CAI XIANJUN (Autor:in) / TIAN XIAOCHUN (Autor:in) / HUANG BO (Autor:in) / TU LINGCHEN (Autor:in) / YANG YI (Autor:in)
02.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Gravel pile composite foundation and construction method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Electrolytic gravel pile composite foundation for liquefiable foundation and construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Cement fly-ash gravel (CFG) pile composite foundation construction process
Europäisches Patentamt | 2020
|