Waterproof curtain replacement construction structure between cobble stratum support piles and construction process
The invention belongs to the technical field of waterproof curtain construction and particularly relates to a waterproof curtain replacement construction structure between cobble stratum support pilesand a construction process. The waterproof curtain replacement construction structure comprises support piles arranged in a driving mode. A reinforcement cage is arranged in each support pile. Concrete is poured in the support piles. The support piles are uniformly spaced. Replacement cement soil piles are arranged between every two adjacent support piles. The two sides of each replacement cementsoil pile are both in lap joint with the corresponding support piles. The replacement cement soil piles are internally filled with cement soil. The waterproof curtain replacement construction structure between the cobble stratum support piles ensures the crossing construction quality of a cobble section. During construction, the structure can be reasonably selected according to the center distance between the support piles. The engineering problems are solved. The waterproof curtain replacement construction structure is good in economic efficiency.
本发明属于止水帷幕施工技术领域,特别涉及一种卵石地层支护桩间置换施工止水帷幕结构及施工工艺,包括打设的支护桩,所述支护桩内放有钢筋笼,支护桩内浇筑有混凝土,所述支护桩均匀间隔开,每两支护桩之间均设有置换水泥土桩,所述置换水泥土桩两边均与支护桩搭接,置换水泥土桩内充填水泥土。本发明的支护桩间置换施工止水帷幕结构保证了穿越卵石段的施工质量,施工时可以根据支护桩中心距大小合理选择结构,解决了工程难题,经济性较好。
Waterproof curtain replacement construction structure between cobble stratum support piles and construction process
The invention belongs to the technical field of waterproof curtain construction and particularly relates to a waterproof curtain replacement construction structure between cobble stratum support pilesand a construction process. The waterproof curtain replacement construction structure comprises support piles arranged in a driving mode. A reinforcement cage is arranged in each support pile. Concrete is poured in the support piles. The support piles are uniformly spaced. Replacement cement soil piles are arranged between every two adjacent support piles. The two sides of each replacement cementsoil pile are both in lap joint with the corresponding support piles. The replacement cement soil piles are internally filled with cement soil. The waterproof curtain replacement construction structure between the cobble stratum support piles ensures the crossing construction quality of a cobble section. During construction, the structure can be reasonably selected according to the center distance between the support piles. The engineering problems are solved. The waterproof curtain replacement construction structure is good in economic efficiency.
本发明属于止水帷幕施工技术领域,特别涉及一种卵石地层支护桩间置换施工止水帷幕结构及施工工艺,包括打设的支护桩,所述支护桩内放有钢筋笼,支护桩内浇筑有混凝土,所述支护桩均匀间隔开,每两支护桩之间均设有置换水泥土桩,所述置换水泥土桩两边均与支护桩搭接,置换水泥土桩内充填水泥土。本发明的支护桩间置换施工止水帷幕结构保证了穿越卵石段的施工质量,施工时可以根据支护桩中心距大小合理选择结构,解决了工程难题,经济性较好。
Waterproof curtain replacement construction structure between cobble stratum support piles and construction process
一种卵石地层支护桩间置换施工止水帷幕结构及施工工艺
SUN JIE (Autor:in) / SHI YI (Autor:in) / SUN XIAOHUI (Autor:in) / QIAO XIUBING (Autor:in) / ZHOU PING (Autor:in) / YOU CHUTONG (Autor:in)
02.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pebble stratum waterproof curtain construction method
Europäisches Patentamt | 2021
|Composite stratum waterproof curtain construction method
Europäisches Patentamt | 2024
|Rapid leaking stoppage construction method between waterproof curtain piles
Europäisches Patentamt | 2024
|Construction method of waterproof curtain between plastic concrete piles
Europäisches Patentamt | 2020
|Construction method for waterproof curtain of sandy gravel stratum
Europäisches Patentamt | 2022
|