Rapid leaking stoppage construction method between waterproof curtain piles
The invention relates to the technical field of waterproof curtains, and discloses a waterproof curtain inter-pile rapid leaking stoppage construction method which comprises the following construction steps that (1) a water leakage position is arranged in an inter-pile area, water leakage holes are formed in the water leakage position, and the water leakage position is cleaned; (2) the water leakage holes are stuffed with filler; (3) a water drainage pipe is inserted into the water drainage hole; (4) a formwork is arranged on the outer side of the inter-pile area, and a pouring area is formed between the formwork and the inter-pile area; (5) the solidified slurry is poured into the pouring space, and a solidified layer is formed after hardening; the water leakage position is cleaned, the blockage of foreign matter to the water leakage position is reduced, the filler is stuffed into the water leakage hole so as to avoid the situation that the hole of the water leakage position is expanded due to excessive loss of silt in the water leakage position, water in the water leakage position is discharged through the water drainage pipe so as to facilitate subsequent plugging, and after the template is arranged, curing slurry is poured into the pouring space, so that the water leakage position is prevented from being blocked. After the solidified slurry is hardened, a solidified layer is formed, the water leakage position is covered with the solidified layer, and the water leakage hole is sealed.
本发明涉及止水帷幕的技术领域,公开了止水帷幕桩间快速堵漏施工方法,包括以下施工步骤:1)、桩间区域具有漏水位,漏水位具有漏水孔,对漏水位进行清理;2)、在漏水孔中塞入填充物;3)、在漏水孔中插入泄水管;4)、在桩间区域的外侧设置模板,模板的与桩间区域之间形成浇注区域;5)、将固化浆浇注在浇注空间中,硬化后,形成固化层;清理漏水位,减少异物对漏水位封堵时的阻碍,将填充物塞入漏水孔中,是为了避免漏水位中的泥沙流失过多而导致漏水位的孔洞扩大,通过泄水管将漏水位中的水排出,以便后续的封堵,通过设置模板后,将固化浆浇注在浇注空间中,待固化浆硬化后,形成固化层,固化层将漏水位覆盖,且封闭了漏水孔。
Rapid leaking stoppage construction method between waterproof curtain piles
The invention relates to the technical field of waterproof curtains, and discloses a waterproof curtain inter-pile rapid leaking stoppage construction method which comprises the following construction steps that (1) a water leakage position is arranged in an inter-pile area, water leakage holes are formed in the water leakage position, and the water leakage position is cleaned; (2) the water leakage holes are stuffed with filler; (3) a water drainage pipe is inserted into the water drainage hole; (4) a formwork is arranged on the outer side of the inter-pile area, and a pouring area is formed between the formwork and the inter-pile area; (5) the solidified slurry is poured into the pouring space, and a solidified layer is formed after hardening; the water leakage position is cleaned, the blockage of foreign matter to the water leakage position is reduced, the filler is stuffed into the water leakage hole so as to avoid the situation that the hole of the water leakage position is expanded due to excessive loss of silt in the water leakage position, water in the water leakage position is discharged through the water drainage pipe so as to facilitate subsequent plugging, and after the template is arranged, curing slurry is poured into the pouring space, so that the water leakage position is prevented from being blocked. After the solidified slurry is hardened, a solidified layer is formed, the water leakage position is covered with the solidified layer, and the water leakage hole is sealed.
本发明涉及止水帷幕的技术领域,公开了止水帷幕桩间快速堵漏施工方法,包括以下施工步骤:1)、桩间区域具有漏水位,漏水位具有漏水孔,对漏水位进行清理;2)、在漏水孔中塞入填充物;3)、在漏水孔中插入泄水管;4)、在桩间区域的外侧设置模板,模板的与桩间区域之间形成浇注区域;5)、将固化浆浇注在浇注空间中,硬化后,形成固化层;清理漏水位,减少异物对漏水位封堵时的阻碍,将填充物塞入漏水孔中,是为了避免漏水位中的泥沙流失过多而导致漏水位的孔洞扩大,通过泄水管将漏水位中的水排出,以便后续的封堵,通过设置模板后,将固化浆浇注在浇注空间中,待固化浆硬化后,形成固化层,固化层将漏水位覆盖,且封闭了漏水孔。
Rapid leaking stoppage construction method between waterproof curtain piles
止水帷幕桩间快速堵漏施工方法
HU TINGTING (Autor:in) / ZHANG JUYAN (Autor:in) / NAN BING (Autor:in) / WAN PIXIN (Autor:in) / XIANG YONGJUN (Autor:in)
27.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Leaking stoppage method for SMW construction method pile waterproof curtain
Europäisches Patentamt | 2024
|Waterproof curtain inter-pile leaking stoppage process and construction structure
Europäisches Patentamt | 2023
|Non-inter-pile quick leaking stoppage construction method for waterproof curtain
Europäisches Patentamt | 2024
|Building waterproof construction leaking stoppage device
Europäisches Patentamt | 2024
|Underground waterproof leaking stoppage structure and construction method thereof
Europäisches Patentamt | 2023
|