Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a high-strength building pile driving machine. The high-strength building pile driving machine comprises a base and a pile head located below a cross beam. Second sliding plates are arranged on the two sides of the top end face of the base in a sliding manner, and supporting plates are perpendicularly arranged on the top end faces of the two sets of the second sliding plates. The two sets of supporting plates are symmetrically arranged, and a cross beam is horizontally connected to the top ends of the two sets of supporting plates. A first sliding plate is arranged on the top end face of the cross beam in a sliding manner, and a winch is arranged on the top end face of the first sliding plate. A third notch is formed in the position, on one side of the winch, of thefirst sliding plate, guide pulleys are rotationally installed in the third notch, and the two sets of guide pulleys abut against each other. A steel rope is wound around the winch, and the other endof the steel rope penetrates the two sets of guide pulleys and the cross beam and is connected with the pile head in a binding manner. The high-strength building pile driving machine is reasonable instructure, has good adjusting performance, safety protection performance and stability and is worthy of being popularized.
本发明公开了一种高强度的建筑用打桩机,包括底座及位于横梁下方的桩头,所述底座顶端面的两侧均滑动设置有第二滑板,两组所述第二滑板的顶端面上均垂直设置有支撑板,两组所述支撑板对称设置,且两组所述支撑板的顶端水平连接有横梁,所述横梁的顶端面上滑动设置有第一滑板,所述第一滑板的顶端面上设置有卷扬机,所述卷扬机一侧的第一滑板上开设有第三槽口,所述第三槽口内转动安装有导向滑轮,所述导向滑轮设置有两组且相互抵接,所述卷扬机上卷绕有钢索,所述钢索的另一端穿过两组所述导向滑轮及横梁与桩头绑接。该高强度的建筑用打桩机,结构合理,具有良好的调节性能、安全防护性能及稳定性,值得推广。
The invention discloses a high-strength building pile driving machine. The high-strength building pile driving machine comprises a base and a pile head located below a cross beam. Second sliding plates are arranged on the two sides of the top end face of the base in a sliding manner, and supporting plates are perpendicularly arranged on the top end faces of the two sets of the second sliding plates. The two sets of supporting plates are symmetrically arranged, and a cross beam is horizontally connected to the top ends of the two sets of supporting plates. A first sliding plate is arranged on the top end face of the cross beam in a sliding manner, and a winch is arranged on the top end face of the first sliding plate. A third notch is formed in the position, on one side of the winch, of thefirst sliding plate, guide pulleys are rotationally installed in the third notch, and the two sets of guide pulleys abut against each other. A steel rope is wound around the winch, and the other endof the steel rope penetrates the two sets of guide pulleys and the cross beam and is connected with the pile head in a binding manner. The high-strength building pile driving machine is reasonable instructure, has good adjusting performance, safety protection performance and stability and is worthy of being popularized.
本发明公开了一种高强度的建筑用打桩机,包括底座及位于横梁下方的桩头,所述底座顶端面的两侧均滑动设置有第二滑板,两组所述第二滑板的顶端面上均垂直设置有支撑板,两组所述支撑板对称设置,且两组所述支撑板的顶端水平连接有横梁,所述横梁的顶端面上滑动设置有第一滑板,所述第一滑板的顶端面上设置有卷扬机,所述卷扬机一侧的第一滑板上开设有第三槽口,所述第三槽口内转动安装有导向滑轮,所述导向滑轮设置有两组且相互抵接,所述卷扬机上卷绕有钢索,所述钢索的另一端穿过两组所述导向滑轮及横梁与桩头绑接。该高强度的建筑用打桩机,结构合理,具有良好的调节性能、安全防护性能及稳定性,值得推广。
High-strength building pile driving machine
一种高强度的建筑用打桩机
HE LILI (Autor:in)
16.10.2020
Patent
Elektronische Ressource
Chinesisch
PILE DRIVING MACHINE, AND LIFTING METHOD OF PILE DRIVING MACHINE
Europäisches Patentamt | 2019
|