Bridge construction hanging basket advancing construction method
The invention discloses a bridge construction hanging basket advancing construction method, which comprises the steps of firstly, preparing an arrangement rail, wherein the arrangement rail comprisesa rail structure, an installation sliding block and a limiting device; secondly, laying the rail structure is laid on the built bridge surface; thirdly, fixedly installing the bottom of a rhombic frame of the hanging basket on the installation sliding block, and assembling a hanging basket structure; fourthly, driving the installation sliding block to slide on the rail structure by using a traction hoist, and driving the hanging basket structure to walk through sliding of the installation sliding block; fifthly, after the hanging basket is horizontally moved to the preset position, sliding thelimiting device to be attached to the installation sliding block, and then fixing the limiting device to the rail structure to limit the installation sliding block; and sixthly, after the construction is completed, abutting another section of the rail structure at the end of the rail structure, and fixedly installing the rail structure on the bridge surface, opening the limiting device, draggingthe hanging basket to horizontally move to the next construction area, repeating the second step to the fifth step, and conducting continuous construction of the hanging basket.
本发明公开了桥梁施工挂篮行进的施工方法,步骤一、准备布置轨道,布置轨道包括轨道结构、安装滑动块和限位装置;步骤二、在已修建好的桥梁面上铺设轨道结构;步骤三、将挂篮菱形构架的底部固定安装在安装滑动块上并组装挂篮结构;步骤四、利用牵引葫芦带动安装滑动块在轨道结构上滑动,通过安装滑动块的滑动带动挂篮结构进行行走;步骤五、当挂篮平移至预设位置后,将限位装置滑动至与安装滑动块相贴靠,然后将限位装置固定在轨道结构上对安装滑动块进行限位;步骤六、施工完成后,在轨道结构的端头对接另一段轨道结构并安装固定在桥梁面上,打开限位装置,牵引挂篮平移至下一施工区域,重复步骤二至步骤五,进行挂篮的连续施工。
Bridge construction hanging basket advancing construction method
The invention discloses a bridge construction hanging basket advancing construction method, which comprises the steps of firstly, preparing an arrangement rail, wherein the arrangement rail comprisesa rail structure, an installation sliding block and a limiting device; secondly, laying the rail structure is laid on the built bridge surface; thirdly, fixedly installing the bottom of a rhombic frame of the hanging basket on the installation sliding block, and assembling a hanging basket structure; fourthly, driving the installation sliding block to slide on the rail structure by using a traction hoist, and driving the hanging basket structure to walk through sliding of the installation sliding block; fifthly, after the hanging basket is horizontally moved to the preset position, sliding thelimiting device to be attached to the installation sliding block, and then fixing the limiting device to the rail structure to limit the installation sliding block; and sixthly, after the construction is completed, abutting another section of the rail structure at the end of the rail structure, and fixedly installing the rail structure on the bridge surface, opening the limiting device, draggingthe hanging basket to horizontally move to the next construction area, repeating the second step to the fifth step, and conducting continuous construction of the hanging basket.
本发明公开了桥梁施工挂篮行进的施工方法,步骤一、准备布置轨道,布置轨道包括轨道结构、安装滑动块和限位装置;步骤二、在已修建好的桥梁面上铺设轨道结构;步骤三、将挂篮菱形构架的底部固定安装在安装滑动块上并组装挂篮结构;步骤四、利用牵引葫芦带动安装滑动块在轨道结构上滑动,通过安装滑动块的滑动带动挂篮结构进行行走;步骤五、当挂篮平移至预设位置后,将限位装置滑动至与安装滑动块相贴靠,然后将限位装置固定在轨道结构上对安装滑动块进行限位;步骤六、施工完成后,在轨道结构的端头对接另一段轨道结构并安装固定在桥梁面上,打开限位装置,牵引挂篮平移至下一施工区域,重复步骤二至步骤五,进行挂篮的连续施工。
Bridge construction hanging basket advancing construction method
桥梁施工挂篮行进的施工方法
LI JI (Autor:in) / LI PING (Autor:in) / CHEN HU (Autor:in) / WU YAODONG (Autor:in) / NI YONG (Autor:in) / ZENG ZHAOJIANG (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken