Construction method of poling board between piles
The invention discloses a construction method of a poling board between piles. The construction method particularly comprises the following steps that step one, after setting-out positioning of digging piles, the centers of the two adjacent digging piles are connected through a straight line, and a mark of the connecting line is marked on the ground; step two, the digging piles are processed, after processing, rigid foam columns are bound to both ends of the axis of a reinforcement cage, and spacer bars are welded to the top end of the reinforcement cage; step three, the digging piles are poured, and after forming is achieved and the design strength is reached, the rigid foam columns are chiseled away to form grooves; and step four, a prefabricated baffle plate is inserted into the groovesfor assembly, and then soil is backfilled. The construction method is simpler and more efficient, and the connection construction operation of the digging piles and the poling board between the pilesis simple and fast, so that the construction efficiency is improved, and the construction period is shortened, and on the other hand, the construction quality of the poling board can also be ensured,and the appearance of the poling board meets the specification requirements.
本发明公开了一种桩间挡土板的施工方法,具体包括如下步骤:步骤一:挖孔桩放线定位后,用直线连接两相邻挖孔桩中心,并在地面标出该连线标识;步骤二:对挖孔桩进行加工,加工完毕后将硬质泡沫柱绑扎于钢筋笼的轴线两端上,在钢筋笼顶端焊接定位钢筋;步骤三:对挖孔桩进行浇筑,待成型并且达到设计强度后,凿除硬质泡沫柱,形成凹槽;步骤四:将预制挡板插入凹槽内进行拼装,然后回填土。本申请提出一种更为简便、高效的施工方法,使得挖孔桩与桩间挡土板的连接施工操作简单、快速,从而提高施工效率,缩短施工工期,另一方面也能保证挡土板施工质量,同时保证其外观达到规范要求。
Construction method of poling board between piles
The invention discloses a construction method of a poling board between piles. The construction method particularly comprises the following steps that step one, after setting-out positioning of digging piles, the centers of the two adjacent digging piles are connected through a straight line, and a mark of the connecting line is marked on the ground; step two, the digging piles are processed, after processing, rigid foam columns are bound to both ends of the axis of a reinforcement cage, and spacer bars are welded to the top end of the reinforcement cage; step three, the digging piles are poured, and after forming is achieved and the design strength is reached, the rigid foam columns are chiseled away to form grooves; and step four, a prefabricated baffle plate is inserted into the groovesfor assembly, and then soil is backfilled. The construction method is simpler and more efficient, and the connection construction operation of the digging piles and the poling board between the pilesis simple and fast, so that the construction efficiency is improved, and the construction period is shortened, and on the other hand, the construction quality of the poling board can also be ensured,and the appearance of the poling board meets the specification requirements.
本发明公开了一种桩间挡土板的施工方法,具体包括如下步骤:步骤一:挖孔桩放线定位后,用直线连接两相邻挖孔桩中心,并在地面标出该连线标识;步骤二:对挖孔桩进行加工,加工完毕后将硬质泡沫柱绑扎于钢筋笼的轴线两端上,在钢筋笼顶端焊接定位钢筋;步骤三:对挖孔桩进行浇筑,待成型并且达到设计强度后,凿除硬质泡沫柱,形成凹槽;步骤四:将预制挡板插入凹槽内进行拼装,然后回填土。本申请提出一种更为简便、高效的施工方法,使得挖孔桩与桩间挡土板的连接施工操作简单、快速,从而提高施工效率,缩短施工工期,另一方面也能保证挡土板施工质量,同时保证其外观达到规范要求。
Construction method of poling board between piles
桩间挡土板的施工方法
QIAO LIPING (Autor:in) / LI YUNDI (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch