Building core tube construction method and system
The embodiment of the invention provides a building core tube construction method and system. A plurality of inner side wall forms are fixed to the inner side of a steel bar frame where a side wall islocated, a plurality of outer side wall forms are fixed to the outer side of a steel bar frame where the side wall is located, a plurality of first top wall forms and a plurality of second top wall forms are fixed to the inner side of a steel bar frame where a top wall is located through supporting devices, concrete is poured into the steel bar frame where the side wall is located to form the side wall, concrete is poured into the steel bar frame where the top wall is located to form the top wall, the plurality of first top wall forms are disassembled from the top wall when the strength of the concrete in the top wall reaches the first preset strength, and the plurality of first top wall forms disassembled are moved to the next floor applied with the same at a later stage. According to the method and system, an outer climbing protection frame body carries the outer side wall forms to climb as a whole to perform form assembling and disassembling, and the top wall forms are removed in advance by using an early-dismounting head to support the frame body, so that continuing to erect the forms at the next floor is facilitated, and the overall construction progress of a building can beaccelerated.
本发明实施例提供的建筑核心筒的施工方法及系统,将若干个内侧墙模板固定在侧墙所在钢筋架的内侧,将若干个外侧墙模板固定在侧墙所在钢筋架的外侧,将若干个第一顶墙模板和若干个第二顶墙模板通过支撑装置固定在顶墙所在钢筋架的内侧,将混凝土向侧墙所在钢筋架中浇筑,以形成侧墙,将混凝土向顶墙所在钢筋架中浇筑,以形成顶墙,待顶墙中的混凝土强度到达第一预设强度时,将若干个第一顶墙模板从顶墙拆卸,并将拆卸下的若干个第一顶墙模板移动至下一待使用的楼层。本发明通过外爬升防护架体携带外侧墙模板整体爬升进行装卸模板,以及利用早拆头支撑架体将顶墙模板提前拆除,方便下一楼层继续支模,本方案能够加快建筑整体施工进度。
Building core tube construction method and system
The embodiment of the invention provides a building core tube construction method and system. A plurality of inner side wall forms are fixed to the inner side of a steel bar frame where a side wall islocated, a plurality of outer side wall forms are fixed to the outer side of a steel bar frame where the side wall is located, a plurality of first top wall forms and a plurality of second top wall forms are fixed to the inner side of a steel bar frame where a top wall is located through supporting devices, concrete is poured into the steel bar frame where the side wall is located to form the side wall, concrete is poured into the steel bar frame where the top wall is located to form the top wall, the plurality of first top wall forms are disassembled from the top wall when the strength of the concrete in the top wall reaches the first preset strength, and the plurality of first top wall forms disassembled are moved to the next floor applied with the same at a later stage. According to the method and system, an outer climbing protection frame body carries the outer side wall forms to climb as a whole to perform form assembling and disassembling, and the top wall forms are removed in advance by using an early-dismounting head to support the frame body, so that continuing to erect the forms at the next floor is facilitated, and the overall construction progress of a building can beaccelerated.
本发明实施例提供的建筑核心筒的施工方法及系统,将若干个内侧墙模板固定在侧墙所在钢筋架的内侧,将若干个外侧墙模板固定在侧墙所在钢筋架的外侧,将若干个第一顶墙模板和若干个第二顶墙模板通过支撑装置固定在顶墙所在钢筋架的内侧,将混凝土向侧墙所在钢筋架中浇筑,以形成侧墙,将混凝土向顶墙所在钢筋架中浇筑,以形成顶墙,待顶墙中的混凝土强度到达第一预设强度时,将若干个第一顶墙模板从顶墙拆卸,并将拆卸下的若干个第一顶墙模板移动至下一待使用的楼层。本发明通过外爬升防护架体携带外侧墙模板整体爬升进行装卸模板,以及利用早拆头支撑架体将顶墙模板提前拆除,方便下一楼层继续支模,本方案能够加快建筑整体施工进度。
Building core tube construction method and system
建筑核心筒的施工方法及系统
YIN JIANBO (Autor:in) / ZHAO JINSHE (Autor:in) / CHEN KAI (Autor:in) / MEI XIAN (Autor:in) / ZHUANG QISHENG (Autor:in)
30.10.2020
Patent
Elektronische Ressource
Chinesisch
Construction method of frame-core tube building structure
Europäisches Patentamt | 2024
|Protection structure for building internal core tube construction
Europäisches Patentamt | 2020
|Braced frame-core tube building structure and construction method thereof
Europäisches Patentamt | 2021
|Construction method of core tube steel structure building for viewing
Europäisches Patentamt | 2023
|