Precast concrete assembled guardrail and mounting method
The invention provides a precast concrete assembled guardrail and a mounting method, and relates to a highway bridge guardrail safety facility. Problems that in the prior art, a precast concrete guardrail is complex in installation process and poor in quality are solved. The precast concrete assembled guardrail comprises a precast concrete guardrail and a beam plate, wherein a preformed groove isformed between the bottom of the precast concrete guardrail and a flange plate of a beam plate, a first steel bar ring is pre-buried in the precast concrete guardrail, a part of the ring body of the first steel bar ring is downwards exposed out of the preformed groove, a second steel bar ring is pre-buried in the beam plate, and a part of the ring body of the second steel bar ring is upwards exposed out of the beam plate. The guardrail is simple in structure, low in manufacturing cost, convenient to install and high in construction speed, the reinforcing steel bars can be free of welding, andthe inner and outer reinforcing steel bars can be temporarily fixed through spot welding or binding generally. The construction difficulties of a long field construction period, high construction difficulty, difficult quality control and the like are solved, and transformation from field construction to factory intensive construction is realized.
本发明提供了一种预制混凝土拼装护栏及安装方法,涉及一种公路桥梁护栏安全设施。它解决了现有技术中预制混凝土护栏安装工艺复杂、质量较差的问题。本预制混凝土拼装护栏,包括预制混凝土护栏、梁板,所述预制混凝土护栏底部与梁板翼缘板处形成的预留槽,所述预制混凝土护栏内预埋第一钢筋圈,所述第一钢筋圈的部分圈体朝下露出在预留槽处,所述梁板内预埋第二钢筋圈,所述第二钢筋圈的部分圈体朝上露出在梁板外。本发明结构简单,制作成本低,安装便利,施工速度快,钢筋可以免焊接,一般情况下可以通过点焊或绑扎对内外侧钢筋临时固定。解决现场施工工期长、施工难度大、质量难以管控等施工难点,实现现场施工到工厂集约化施工的转变。
Precast concrete assembled guardrail and mounting method
The invention provides a precast concrete assembled guardrail and a mounting method, and relates to a highway bridge guardrail safety facility. Problems that in the prior art, a precast concrete guardrail is complex in installation process and poor in quality are solved. The precast concrete assembled guardrail comprises a precast concrete guardrail and a beam plate, wherein a preformed groove isformed between the bottom of the precast concrete guardrail and a flange plate of a beam plate, a first steel bar ring is pre-buried in the precast concrete guardrail, a part of the ring body of the first steel bar ring is downwards exposed out of the preformed groove, a second steel bar ring is pre-buried in the beam plate, and a part of the ring body of the second steel bar ring is upwards exposed out of the beam plate. The guardrail is simple in structure, low in manufacturing cost, convenient to install and high in construction speed, the reinforcing steel bars can be free of welding, andthe inner and outer reinforcing steel bars can be temporarily fixed through spot welding or binding generally. The construction difficulties of a long field construction period, high construction difficulty, difficult quality control and the like are solved, and transformation from field construction to factory intensive construction is realized.
本发明提供了一种预制混凝土拼装护栏及安装方法,涉及一种公路桥梁护栏安全设施。它解决了现有技术中预制混凝土护栏安装工艺复杂、质量较差的问题。本预制混凝土拼装护栏,包括预制混凝土护栏、梁板,所述预制混凝土护栏底部与梁板翼缘板处形成的预留槽,所述预制混凝土护栏内预埋第一钢筋圈,所述第一钢筋圈的部分圈体朝下露出在预留槽处,所述梁板内预埋第二钢筋圈,所述第二钢筋圈的部分圈体朝上露出在梁板外。本发明结构简单,制作成本低,安装便利,施工速度快,钢筋可以免焊接,一般情况下可以通过点焊或绑扎对内外侧钢筋临时固定。解决现场施工工期长、施工难度大、质量难以管控等施工难点,实现现场施工到工厂集约化施工的转变。
Precast concrete assembled guardrail and mounting method
一种预制混凝土拼装护栏及安装方法
FU JIANHONG (Autor:in) / FANG YONGWEI (Autor:in) / WANG ZHENGJUN (Autor:in) / LEI BO (Autor:in) / CHEN ZHENGXING (Autor:in) / LIU BINGDONG (Autor:in) / PENG JUN'AN (Autor:in) / CAO JUEYU (Autor:in) / WU HAO (Autor:in) / CHEN JUNFU (Autor:in)
20.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Wall type guardrail concrete precast block and mounting method thereof
Europäisches Patentamt | 2023
|Small box girder bridge deck precast concrete guardrail mounting system and mounting method
Europäisches Patentamt | 2024
|Full-automatic guardrail mounting equipment and guardrail mounting vehicle
Europäisches Patentamt | 2024
|Semi-fabricated concrete guardrail and mounting method thereof
Europäisches Patentamt | 2022
|