Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel arch tower support-free installation structure
The invention discloses a steel arch tower support-free installation structure which comprises an arch tower made of stainless steel. The arch tower comprises a plurality of subsections, namely a first subsection (11), a second subsection (12), a third subsection (13), a fourth subsection (14), a fifth subsection (15), a sixth subsection (16), a seventh subsection (17) and an arch crown (18). Thefirst subsection (11), the second subsection (12), the third subsection (13), the fourth subsection (14), the fifth subsection (15), the sixth subsection (16) and the seventh subsection (17) are symmetrically arranged; and a main tower cross beam (21) and a plurality of temporary supports are included. Through scientific and rigorous calculation, the support is only installed at the position needing to be set, a whole installation process is measured and monitored, safety and reliability are achieved, support resources are saved, and work efficiency is improved.
本发明公开了一种钢拱塔无支架安装结构,包括:拱塔,拱塔为不锈钢材质;拱塔包括多个分段:第一分段(11)、第二分段(12)、第三分段(13)、第四分段(14)、第五分段(15)、第六分段(16)、第七分段(17)以及拱顶(18);其中,第一分段(11)、第二分段(12)、第三分段(13)、第四分段(14)、第五分段(15)、第六分段(16)、第七分段(17)对称布置;还包括主塔横梁(21)、多个临时支撑。经过科学严谨的计算,仅在需要设置的位置安装支撑,安装过程全程测量监控,安全可靠,节约了支架资源,提高了工效。
Steel arch tower support-free installation structure
The invention discloses a steel arch tower support-free installation structure which comprises an arch tower made of stainless steel. The arch tower comprises a plurality of subsections, namely a first subsection (11), a second subsection (12), a third subsection (13), a fourth subsection (14), a fifth subsection (15), a sixth subsection (16), a seventh subsection (17) and an arch crown (18). Thefirst subsection (11), the second subsection (12), the third subsection (13), the fourth subsection (14), the fifth subsection (15), the sixth subsection (16) and the seventh subsection (17) are symmetrically arranged; and a main tower cross beam (21) and a plurality of temporary supports are included. Through scientific and rigorous calculation, the support is only installed at the position needing to be set, a whole installation process is measured and monitored, safety and reliability are achieved, support resources are saved, and work efficiency is improved.
本发明公开了一种钢拱塔无支架安装结构,包括:拱塔,拱塔为不锈钢材质;拱塔包括多个分段:第一分段(11)、第二分段(12)、第三分段(13)、第四分段(14)、第五分段(15)、第六分段(16)、第七分段(17)以及拱顶(18);其中,第一分段(11)、第二分段(12)、第三分段(13)、第四分段(14)、第五分段(15)、第六分段(16)、第七分段(17)对称布置;还包括主塔横梁(21)、多个临时支撑。经过科学严谨的计算,仅在需要设置的位置安装支撑,安装过程全程测量监控,安全可靠,节约了支架资源,提高了工效。
Steel arch tower support-free installation structure
一种钢拱塔无支架安装结构
20.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Installation method and installation structure of steel arch bridge arch rib section
Europäisches Patentamt | 2020
|Steel arch bridge inward-inclining arch rib and arch support combined section installation method
Europäisches Patentamt | 2020
|Steel arch tower closure inner supporting device and steel arch tower closure method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|