Power overhead line construction device and construction method thereof
The invention discloses a power overhead line construction device and a construction method thereof, and belongs to the technical field of power overhead lines. The method comprises the following steps: S1, performing telegraph pole installation: digging a pit on the ground, placing a telegraph pole in the pit and burying the telegraph pole with soil, and then pouring concrete to realize stable installation of the telegraph pole; S2, installing a hoisting mechanism: placing the installation base on the ground and connected with the ground through installation rivets, and achieving installationof the hoisting mechanism; S3, welding limiting blocks: welding three limiting blocks to the top of the first hoop body and the top of the second hoop body correspondingly; S4, welding a first guidemechanism: welding two first fixing rods to the circumferential surface of the first hoop body and the circumferential surface of the second hoop body correspondingly, then welding a first guide wheelto the circumferential surface of a first rotating shaft, and arranging the first rotating shaft rotationally between the two first fixing rods through a bearing; and S5, welding a second guide mechanism.
本发明公开了一种电力架空线路施工装置及其施工方法,属于电力架空线技术领域,包括如下步骤:包括如下步骤:S1、安装电线杆:在地面上挖坑,将电线杆置于坑内并用土进行掩埋,然后通过混凝土进行浇筑,实现电线杆的稳固安装;S2、安装卷扬机构:将安装座置于地面,同时通过安装铆钉将其与地面连接,实现卷扬机构的安装;S3、焊接限位块:在第一抱箍本体和第二抱箍本体的顶部各焊接三个限位块;S4、焊接第一导向机构:分别在第一抱箍本体和第二抱箍本体的圆周表面焊接两个第一固定杆,然后将第一导向轮焊接在第一转轴圆周表面,通过轴承将第一转轴转动设置在两个第一固定杆之间;S5、焊接第二导向机构。
Power overhead line construction device and construction method thereof
The invention discloses a power overhead line construction device and a construction method thereof, and belongs to the technical field of power overhead lines. The method comprises the following steps: S1, performing telegraph pole installation: digging a pit on the ground, placing a telegraph pole in the pit and burying the telegraph pole with soil, and then pouring concrete to realize stable installation of the telegraph pole; S2, installing a hoisting mechanism: placing the installation base on the ground and connected with the ground through installation rivets, and achieving installationof the hoisting mechanism; S3, welding limiting blocks: welding three limiting blocks to the top of the first hoop body and the top of the second hoop body correspondingly; S4, welding a first guidemechanism: welding two first fixing rods to the circumferential surface of the first hoop body and the circumferential surface of the second hoop body correspondingly, then welding a first guide wheelto the circumferential surface of a first rotating shaft, and arranging the first rotating shaft rotationally between the two first fixing rods through a bearing; and S5, welding a second guide mechanism.
本发明公开了一种电力架空线路施工装置及其施工方法,属于电力架空线技术领域,包括如下步骤:包括如下步骤:S1、安装电线杆:在地面上挖坑,将电线杆置于坑内并用土进行掩埋,然后通过混凝土进行浇筑,实现电线杆的稳固安装;S2、安装卷扬机构:将安装座置于地面,同时通过安装铆钉将其与地面连接,实现卷扬机构的安装;S3、焊接限位块:在第一抱箍本体和第二抱箍本体的顶部各焊接三个限位块;S4、焊接第一导向机构:分别在第一抱箍本体和第二抱箍本体的圆周表面焊接两个第一固定杆,然后将第一导向轮焊接在第一转轴圆周表面,通过轴承将第一转轴转动设置在两个第一固定杆之间;S5、焊接第二导向机构。
Power overhead line construction device and construction method thereof
一种电力架空线路施工装置及其施工方法
JIAN DELIN (Autor:in)
20.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Isolation device for power overhead line construction
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1931
Engineering Index Backfile | 1899
|Overhead transmission line power pole and installation and construction method thereof
Europäisches Patentamt | 2021
|