Construction method of double-row glass fiber reinforced plastic sand inclusion pipe culvert
The invention discloses a construction method of a double-row glass fiber reinforced plastic sand inclusion pipe culvert. According to the method, a novel double-row culvert assembly type retaining wall device is adopted in the construction process, so that not only pipeline position and elevation errors in the traditional glass fiber reinforced plastic sand inclusion pipe laying process are elimianted, but also the problem that the glass fiber reinforced plastic sand inclusion pipe and the retaining wall device are not tightly connected in the bearing process is solved, and the construction quality of a glass fiber reinforced plastic sand inclusion pipe culvert is guaranteed; full-prefabricated assembly construction is achieved, maintenance is not needed, the construction speed is greatlyincreased, and the construction efficiency is improved.
本发明公开一种双排玻璃钢夹砂管涵洞的施工方法,该方法在施工过程中采用一种新型双排涵洞装配式挡墙装置,既解决了传统的玻璃钢夹砂管的敷设过程中管道位置与高程误差,又解决了玻璃钢夹砂管与挡墙装置承接过程中衔接不紧密的问题,保证了玻璃钢夹砂管涵洞的施工质量;全预制装配施工,无需养护,大大提升了施工速度,提升了施工效率。
Construction method of double-row glass fiber reinforced plastic sand inclusion pipe culvert
The invention discloses a construction method of a double-row glass fiber reinforced plastic sand inclusion pipe culvert. According to the method, a novel double-row culvert assembly type retaining wall device is adopted in the construction process, so that not only pipeline position and elevation errors in the traditional glass fiber reinforced plastic sand inclusion pipe laying process are elimianted, but also the problem that the glass fiber reinforced plastic sand inclusion pipe and the retaining wall device are not tightly connected in the bearing process is solved, and the construction quality of a glass fiber reinforced plastic sand inclusion pipe culvert is guaranteed; full-prefabricated assembly construction is achieved, maintenance is not needed, the construction speed is greatlyincreased, and the construction efficiency is improved.
本发明公开一种双排玻璃钢夹砂管涵洞的施工方法,该方法在施工过程中采用一种新型双排涵洞装配式挡墙装置,既解决了传统的玻璃钢夹砂管的敷设过程中管道位置与高程误差,又解决了玻璃钢夹砂管与挡墙装置承接过程中衔接不紧密的问题,保证了玻璃钢夹砂管涵洞的施工质量;全预制装配施工,无需养护,大大提升了施工速度,提升了施工效率。
Construction method of double-row glass fiber reinforced plastic sand inclusion pipe culvert
一种双排玻璃钢夹砂管涵洞的施工方法
WANG QINGZHOU (Autor:in) / ZHANG CHAOYANG (Autor:in) / LIANG YINGSHUO (Autor:in) / ZHANG ZHIYIN (Autor:in) / SUN YINGHUI (Autor:in) / SUN JIARONG (Autor:in)
01.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Europäisches Patentamt | 2023
|Reinforced concrete culvert pipe
Engineering Index Backfile | 1926
Performance Assessment on the Plastic Mortar Culvert Reinforced by Glass Fiber
Tema Archiv | 2012
|Performance Assessment on the Plastic Mortar Culvert Reinforced by Glass Fiber
British Library Conference Proceedings | 2012
|Europäisches Patentamt | 2024
|