Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Floor paying-off hole pre-embedding device and construction method thereof
The invention provides a floor paying-off hole pre-embedding device and a construction method thereof. The floor paying-off hole pre-embedding device comprises a base assembly, a pre-embedding part and a buckling cover, wherein the base assembly comprises a base body and a base sealing ring; the base body is fixed to a formwork; the base body is sleeved with the base sealing ring; the pre-embedding part is inserted into an upper opening of the base sealing ring; the pre-embedding part is provided with multiple layers of groove water stop wing rings; the buckling cover covers the pre-embeddingpart. The floor paying-off hole pre-embedding device and the construction method thereof have the beneficial effects that a paying-off hole is convenient to block, chiseling is not needed, the labor intensity of workers is lowered, the labor cost is reduced, and meanwhile the hidden danger of leakage after blocking is effectively avoided.
本发明提供一种楼板放线孔预埋装置及其施工方法,包括底座组件、预埋件以及扣盖,其中:底座组件包括底座本体以及底座密封圈,底座本体固定于模板上,底座密封圈套设于底座本体上;预埋件承插于底座密封圈上口处,预埋件设有多层沟槽止水翼环;扣盖盖设于预埋件上。本发明的有益效果是使放线孔洞便于封堵,无须剔凿,降低了工人的劳动强度,减少了人工成本,同时有效避免了封堵后渗漏的隐患。
Floor paying-off hole pre-embedding device and construction method thereof
The invention provides a floor paying-off hole pre-embedding device and a construction method thereof. The floor paying-off hole pre-embedding device comprises a base assembly, a pre-embedding part and a buckling cover, wherein the base assembly comprises a base body and a base sealing ring; the base body is fixed to a formwork; the base body is sleeved with the base sealing ring; the pre-embedding part is inserted into an upper opening of the base sealing ring; the pre-embedding part is provided with multiple layers of groove water stop wing rings; the buckling cover covers the pre-embeddingpart. The floor paying-off hole pre-embedding device and the construction method thereof have the beneficial effects that a paying-off hole is convenient to block, chiseling is not needed, the labor intensity of workers is lowered, the labor cost is reduced, and meanwhile the hidden danger of leakage after blocking is effectively avoided.
本发明提供一种楼板放线孔预埋装置及其施工方法,包括底座组件、预埋件以及扣盖,其中:底座组件包括底座本体以及底座密封圈,底座本体固定于模板上,底座密封圈套设于底座本体上;预埋件承插于底座密封圈上口处,预埋件设有多层沟槽止水翼环;扣盖盖设于预埋件上。本发明的有益效果是使放线孔洞便于封堵,无须剔凿,降低了工人的劳动强度,减少了人工成本,同时有效避免了封堵后渗漏的隐患。
Floor paying-off hole pre-embedding device and construction method thereof
一种楼板放线孔预埋装置及其施工方法
TI XINGKUAN (Autor:in) / TENG LIJIAN (Autor:in)
04.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Cast-in-place floor reserved hole pre-embedding device and construction method
Europäisches Patentamt | 2021
|High-rise building paying-off hole safety positioning device and construction method thereof
Europäisches Patentamt | 2021
|Binding belt pre-embedding device for floor hole suspended formwork plugging and construction method
Europäisches Patentamt | 2022
|Floor flue hole reserving tool and construction method thereof
Europäisches Patentamt | 2021
|