One-time accurate pre-burying construction method for wire box
The invention discloses a one-time accurate pre-burying construction method for a wire box, and relates to the technical field of civil engineering indoor decoration. The one-time accurate pre-buryingconstruction method comprises the following steps that 1, a wire box frame mold is designed according to the actual position of the wire box, and the wire box frame mold is provided with a clamping frame matched with the wire box in shape; 2, the wire box frame mold is prefabricated in a factory; 3, the wire box frame mold is arranged at a pre-burying position of a building, the wire box frame mold is adjusted to a proper position, the wire box frame mold is fixedly connected with transverse reinforcing steel bars and longitudinal reinforcing steel bars, and the wire box is connected to the clamping frame in a clamped mode; or the wire box is connected to the clamping frame in a clamped mode, the wire box frame mold and the wire box are arranged at the pre-burying position of the building, the wire box frame mold is adjusted to the proper position, and the wire box frame mold is fixedly connected with the transverse reinforcing steel bars and the longitudinal reinforcing steel bars; and 4, concrete is poured. By the adoption of the construction method, the pre-buried precision of the wire box is high, and displacement and deformation are not prone to happen.
本发明公开一种线盒一次精准预埋施工方法,涉及土木工程室内装饰技术领域,其包括以下步骤:步骤一,根据线盒实际位置,设计线盒框架模具,线盒框架模具设置有与线盒形状相匹配的卡接框;步骤二,工厂预制线盒框架模具;步骤三,将线盒框架模具设置于建筑物的预埋位置,并调整线盒框架模具至合适位置,将线盒框架模具与横向钢筋和纵向钢筋均固定连接,将线盒卡接于卡接框内,或者将线盒卡接于卡接框内,将线盒框架模具和线盒设置于建筑物的预埋位置,并调整线盒框架模具至合适位置,将线盒框架模具与横向钢筋和纵向钢筋均固定连接;步骤四,浇筑混凝土。采用该施工方法,线盒预埋精度高,不容易发生移位和变形。
One-time accurate pre-burying construction method for wire box
The invention discloses a one-time accurate pre-burying construction method for a wire box, and relates to the technical field of civil engineering indoor decoration. The one-time accurate pre-buryingconstruction method comprises the following steps that 1, a wire box frame mold is designed according to the actual position of the wire box, and the wire box frame mold is provided with a clamping frame matched with the wire box in shape; 2, the wire box frame mold is prefabricated in a factory; 3, the wire box frame mold is arranged at a pre-burying position of a building, the wire box frame mold is adjusted to a proper position, the wire box frame mold is fixedly connected with transverse reinforcing steel bars and longitudinal reinforcing steel bars, and the wire box is connected to the clamping frame in a clamped mode; or the wire box is connected to the clamping frame in a clamped mode, the wire box frame mold and the wire box are arranged at the pre-burying position of the building, the wire box frame mold is adjusted to the proper position, and the wire box frame mold is fixedly connected with the transverse reinforcing steel bars and the longitudinal reinforcing steel bars; and 4, concrete is poured. By the adoption of the construction method, the pre-buried precision of the wire box is high, and displacement and deformation are not prone to happen.
本发明公开一种线盒一次精准预埋施工方法,涉及土木工程室内装饰技术领域,其包括以下步骤:步骤一,根据线盒实际位置,设计线盒框架模具,线盒框架模具设置有与线盒形状相匹配的卡接框;步骤二,工厂预制线盒框架模具;步骤三,将线盒框架模具设置于建筑物的预埋位置,并调整线盒框架模具至合适位置,将线盒框架模具与横向钢筋和纵向钢筋均固定连接,将线盒卡接于卡接框内,或者将线盒卡接于卡接框内,将线盒框架模具和线盒设置于建筑物的预埋位置,并调整线盒框架模具至合适位置,将线盒框架模具与横向钢筋和纵向钢筋均固定连接;步骤四,浇筑混凝土。采用该施工方法,线盒预埋精度高,不容易发生移位和变形。
One-time accurate pre-burying construction method for wire box
一种线盒一次精准预埋施工方法
HE WEI (Autor:in) / TONG XIUYUAN (Autor:in) / AN XU (Autor:in) / LI WENJING (Autor:in)
04.12.2020
Patent
Elektronische Ressource
Chinesisch
Accurate positioning and pre-burying device for wire box
Europäisches Patentamt | 2020
|