Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined concrete pipe pile for building construction
The invention provides a combined concrete pipe pile for building construction. The combined concrete pipe pile comprises an upper pipe pile body and a lower pipe pile body, a core inserting mechanismis arranged at the bottom end of the upper pipe pile body, a combined shell is fixed to the top end of the lower pipe pile body, and a circular pipe is fixed to the bottom in a cavity of the combinedshell; a clamping mechanism and a pressing mechanism for driving the clamping mechanism are arranged on the circular pipe, the end, being inserted into the cavity of the combined shell, of the core inserting mechanism is inserted into the circular pipe, a sliding mechanism is arranged between the core inserting mechanism and the circular pipe, and a locking mechanism is arranged at the position,between the end with the circular pipe being inserted into and the pressing mechanism, of the core inserting mechanism. By arranging the sliding mechanism, the pressing mechanism, the clamping mechanism and the locking mechanism, the effect of conveniently and rapidly combining and connecting the upper pipe pile body and the lower pipe pile body together is achieved, and meanwhile, the upper pipepile body and the lower pipe pile body can be conveniently decomposed and disassembled.
本发明公开了一种建筑施工用组合式混凝土管桩,包括上管桩和下管桩,所述上管桩的底端设置有插芯机构,所述下管桩的顶端固定有组合外壳,所述组合外壳腔内的底部固定有圆管,所述圆管上设置有夹紧机构和用于驱动夹紧机构的下压机构,所述插芯机构插入组合外壳腔内的一端插入圆管内,且插芯机构与圆管之间设置有滑动机构,所述插芯机构插入圆管的一端与下压机构之间设置有锁定机构。本发明通过设置滑动机构、下压机构、夹紧机构和锁定机构,达到了方便将上管桩与下管桩快速组合连接在一起的效果,同时还方便将上管桩与下管桩进行分解拆卸。
Combined concrete pipe pile for building construction
The invention provides a combined concrete pipe pile for building construction. The combined concrete pipe pile comprises an upper pipe pile body and a lower pipe pile body, a core inserting mechanismis arranged at the bottom end of the upper pipe pile body, a combined shell is fixed to the top end of the lower pipe pile body, and a circular pipe is fixed to the bottom in a cavity of the combinedshell; a clamping mechanism and a pressing mechanism for driving the clamping mechanism are arranged on the circular pipe, the end, being inserted into the cavity of the combined shell, of the core inserting mechanism is inserted into the circular pipe, a sliding mechanism is arranged between the core inserting mechanism and the circular pipe, and a locking mechanism is arranged at the position,between the end with the circular pipe being inserted into and the pressing mechanism, of the core inserting mechanism. By arranging the sliding mechanism, the pressing mechanism, the clamping mechanism and the locking mechanism, the effect of conveniently and rapidly combining and connecting the upper pipe pile body and the lower pipe pile body together is achieved, and meanwhile, the upper pipepile body and the lower pipe pile body can be conveniently decomposed and disassembled.
本发明公开了一种建筑施工用组合式混凝土管桩,包括上管桩和下管桩,所述上管桩的底端设置有插芯机构,所述下管桩的顶端固定有组合外壳,所述组合外壳腔内的底部固定有圆管,所述圆管上设置有夹紧机构和用于驱动夹紧机构的下压机构,所述插芯机构插入组合外壳腔内的一端插入圆管内,且插芯机构与圆管之间设置有滑动机构,所述插芯机构插入圆管的一端与下压机构之间设置有锁定机构。本发明通过设置滑动机构、下压机构、夹紧机构和锁定机构,达到了方便将上管桩与下管桩快速组合连接在一起的效果,同时还方便将上管桩与下管桩进行分解拆卸。
Combined concrete pipe pile for building construction
一种建筑施工用组合式混凝土管桩
CUI JINSHUAI (Autor:in)
08.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Combined concrete pipe pile for building construction
Europäisches Patentamt | 2021
|Combined concrete pipe pile for building construction
Europäisches Patentamt | 2023
|Building concrete pipe pile precast pile enclosure structure construction system
Europäisches Patentamt | 2024
|