Permeable pavement construction process
The invention relates to a permeable pavement construction process, and relates to the field of road construction. The permeable pavement construction process comprises the following steps that S1, asite is selected, a foundation pit is excavated, soil in the foundation pit is cleaned, the foundation pit is tamped, and road shoulders are paved on the two sides of the foundation pit; S2, a gradedbroken stone layer is laid on a foundation pit soil layer, rolled and leveled; S3, a coarse sand layer is paved on the graded broken stone layer, rolled and leveled; S4, water seepage bricks are pavedon the coarse sand layer by utilizing a brick paving device; and S5, finally, gaps between the water seepage bricks and the road shoulders are filled with concrete, and after the concrete is solidified, pavement construction is completed. The permeable pavement construction process has the advantages that water on the road surface can be drained away in time, and the possibility of urban inland inundation caused by accumulated water on the road surface is reduced; and the temperature and humidity of the urban surface can be adjusted, the heat island phenomenon is eliminated, and environmentalprotection is achieved.
本申请涉及一种透水型路面施工工艺,其涉及道路施工的领域,其包括以下步骤:S1、选择场地,并开挖基坑,清理基坑内土壤,并将基坑夯实,并在基坑的两侧铺筑路肩;S2、将级配碎石层摊铺在基坑土层上并碾压整平;S3、将粗砂层摊铺在级配碎石层上并碾压整平;S4、利用铺砖装置将渗水砖铺在粗砂层上;S5、最后将混凝土填补渗水砖和路肩的空隙处,待混凝土凝固后,完成路面施工。本申请效果在于可以及时将路面的水排走,减少发生路面积水,导致发生城市内涝的可能性;也有利于调节城市地表的温度和湿度,消除热岛现象,绿色环保。
Permeable pavement construction process
The invention relates to a permeable pavement construction process, and relates to the field of road construction. The permeable pavement construction process comprises the following steps that S1, asite is selected, a foundation pit is excavated, soil in the foundation pit is cleaned, the foundation pit is tamped, and road shoulders are paved on the two sides of the foundation pit; S2, a gradedbroken stone layer is laid on a foundation pit soil layer, rolled and leveled; S3, a coarse sand layer is paved on the graded broken stone layer, rolled and leveled; S4, water seepage bricks are pavedon the coarse sand layer by utilizing a brick paving device; and S5, finally, gaps between the water seepage bricks and the road shoulders are filled with concrete, and after the concrete is solidified, pavement construction is completed. The permeable pavement construction process has the advantages that water on the road surface can be drained away in time, and the possibility of urban inland inundation caused by accumulated water on the road surface is reduced; and the temperature and humidity of the urban surface can be adjusted, the heat island phenomenon is eliminated, and environmentalprotection is achieved.
本申请涉及一种透水型路面施工工艺,其涉及道路施工的领域,其包括以下步骤:S1、选择场地,并开挖基坑,清理基坑内土壤,并将基坑夯实,并在基坑的两侧铺筑路肩;S2、将级配碎石层摊铺在基坑土层上并碾压整平;S3、将粗砂层摊铺在级配碎石层上并碾压整平;S4、利用铺砖装置将渗水砖铺在粗砂层上;S5、最后将混凝土填补渗水砖和路肩的空隙处,待混凝土凝固后,完成路面施工。本申请效果在于可以及时将路面的水排走,减少发生路面积水,导致发生城市内涝的可能性;也有利于调节城市地表的温度和湿度,消除热岛现象,绿色环保。
Permeable pavement construction process
一种透水型路面施工工艺
CHEN LIMING (Autor:in) / PAN YAN (Autor:in) / WU ZEFAN (Autor:in) / ZHANG TING (Autor:in)
18.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
PERMEABLE PAVEMENT MATERIAL AND CONSTRUCTION METHOD FOR PERMEABLE PAVEMENT MATERIAL
Europäisches Patentamt | 2017
|Water-permeable pavement structure and water-permeable pavement process
Europäisches Patentamt | 2020
|Construction process of water-permeable plastic composite water-permeable concrete pavement
Europäisches Patentamt | 2020
|