Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lifting climbing frame
The invention relates to a lifting climbing frame which comprises a frame body system, an attachment guide system, a power system and a construction protection system. The power system comprises a lifting hanging seat which is arranged on a wall body and is detachably connected with the wall body, an electric hoist which is arranged in the frame body system and a controller which is used for controlling the electric hoist; a lifting rope is arranged on the electric hoist, and one end, deviating from the electric hoist, of the lifting rope penetrates through a frame body to be connected with the lifting hanging seat; the lifting hanging seat is fixed with the wall body through a second through-wall bolt; a clamping assembly is arranged on the lifting hanging seat; the clamping assembly comprises a first clamping plate which is arranged on the lifting hanging seat and attached to the bottom face of the wall body and a second clamping plate which is arranged on the lifting hanging seat and attached to the upper surface of the wall body; and fixing bolts used for fixing the first clamping plate, the second clamping plate and the wall body are arranged between the first clamping plate and the wall body and between the second clamping plate and the wall body. The lifting climbing frame has the advantage that the mounting stability of the lifting hanging seat is improved.
本申请涉及一种提升爬架,包括架体系统、附着导向系统、动力系统和施工防护系统;所述动力系统包括设置于墙体上且与墙体可拆卸连接的提升挂座、设置于架体系统中的电葫芦和用于对电葫芦进行控制的控制器;电葫芦上设置有吊绳,吊绳背离电葫芦的一端穿过架体与提升挂座连接;所述提升挂座与墙体通过第二穿墙螺栓固定;在所述提升挂座上设置有夹持组件;所述夹持组件包括设置于提升挂座上且与墙体底面贴合的第一夹持板和设置于提升挂座上与墙体上表面贴合的第二夹持板;在第一夹持板与墙体之间和第二夹持板与墙体之间设置有用于将第一夹持板、第二夹持板和墙体固定的固定螺栓。本申请具有提高提升挂座安装稳定性的优点。
Lifting climbing frame
The invention relates to a lifting climbing frame which comprises a frame body system, an attachment guide system, a power system and a construction protection system. The power system comprises a lifting hanging seat which is arranged on a wall body and is detachably connected with the wall body, an electric hoist which is arranged in the frame body system and a controller which is used for controlling the electric hoist; a lifting rope is arranged on the electric hoist, and one end, deviating from the electric hoist, of the lifting rope penetrates through a frame body to be connected with the lifting hanging seat; the lifting hanging seat is fixed with the wall body through a second through-wall bolt; a clamping assembly is arranged on the lifting hanging seat; the clamping assembly comprises a first clamping plate which is arranged on the lifting hanging seat and attached to the bottom face of the wall body and a second clamping plate which is arranged on the lifting hanging seat and attached to the upper surface of the wall body; and fixing bolts used for fixing the first clamping plate, the second clamping plate and the wall body are arranged between the first clamping plate and the wall body and between the second clamping plate and the wall body. The lifting climbing frame has the advantage that the mounting stability of the lifting hanging seat is improved.
本申请涉及一种提升爬架,包括架体系统、附着导向系统、动力系统和施工防护系统;所述动力系统包括设置于墙体上且与墙体可拆卸连接的提升挂座、设置于架体系统中的电葫芦和用于对电葫芦进行控制的控制器;电葫芦上设置有吊绳,吊绳背离电葫芦的一端穿过架体与提升挂座连接;所述提升挂座与墙体通过第二穿墙螺栓固定;在所述提升挂座上设置有夹持组件;所述夹持组件包括设置于提升挂座上且与墙体底面贴合的第一夹持板和设置于提升挂座上与墙体上表面贴合的第二夹持板;在第一夹持板与墙体之间和第二夹持板与墙体之间设置有用于将第一夹持板、第二夹持板和墙体固定的固定螺栓。本申请具有提高提升挂座安装稳定性的优点。
Lifting climbing frame
一种提升爬架
XIANG ZHENG (Autor:in) / WANG HAOMING (Autor:in) / LI XUEZHENG (Autor:in) / WANG SHUNJIANG (Autor:in) / LI YUPING (Autor:in) / LIU HAIYANG (Autor:in) / ZHANG QINGZHOU (Autor:in)
25.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Climbing frame lifting system and lifting method thereof
Europäisches Patentamt | 2021
|