Construction method for equipment foundation provided with large embedded part
The invention relates to a construction method of an equipment foundation provided with a large embedded part, and belongs to the technical field of building construction. According to the method, circular embedded part pouring holes in the prior art are reasonably optimized into a concrete pouring belt, so that the vibration range of the foundation is increased, and the compactness of the independent foundation is ensured; adjustable temporary supporting pieces are arranged at control points of blocked embedded parts, so that the flatness of the embedded parts is guaranteed, key assemblies ofthe temporary supporting pieces can be recycled, the temporary material utilization rate is increased, and resource waste is reduced; through special treatment on construction joints, the attractiveness is improved, and the foundation safety is guaranteed; and by reasonably optimizing pouring materials, the construction cost is reduced on the premise that the compactness of the lower portions ofthe large embedded parts is guaranteed.
一种设置有大型预埋件的设备基础施工方法,属于建筑施工技术领域,所述方法通过将现有技术中的圆形埋件浇筑孔合理优化为混凝土浇筑带,增加基础振捣范围,保证独立基础的密实性;通过在分块埋件控制点设置可调临时支撑件,保证埋件平整度,临时支撑件的关键组件可回收提升临时材料利用率,减少资源浪费;通过对施工缝的特殊处理,提升美观性,且保证基础安全性;通过合理优化浇筑材料,保证大型埋件下部密实性的前提下,降低施工成本。
Construction method for equipment foundation provided with large embedded part
The invention relates to a construction method of an equipment foundation provided with a large embedded part, and belongs to the technical field of building construction. According to the method, circular embedded part pouring holes in the prior art are reasonably optimized into a concrete pouring belt, so that the vibration range of the foundation is increased, and the compactness of the independent foundation is ensured; adjustable temporary supporting pieces are arranged at control points of blocked embedded parts, so that the flatness of the embedded parts is guaranteed, key assemblies ofthe temporary supporting pieces can be recycled, the temporary material utilization rate is increased, and resource waste is reduced; through special treatment on construction joints, the attractiveness is improved, and the foundation safety is guaranteed; and by reasonably optimizing pouring materials, the construction cost is reduced on the premise that the compactness of the lower portions ofthe large embedded parts is guaranteed.
一种设置有大型预埋件的设备基础施工方法,属于建筑施工技术领域,所述方法通过将现有技术中的圆形埋件浇筑孔合理优化为混凝土浇筑带,增加基础振捣范围,保证独立基础的密实性;通过在分块埋件控制点设置可调临时支撑件,保证埋件平整度,临时支撑件的关键组件可回收提升临时材料利用率,减少资源浪费;通过对施工缝的特殊处理,提升美观性,且保证基础安全性;通过合理优化浇筑材料,保证大型埋件下部密实性的前提下,降低施工成本。
Construction method for equipment foundation provided with large embedded part
一种设置有大型预埋件的设备基础施工方法
WANG GUOHUI (Autor:in) / YUAN CHUNLEI (Autor:in) / CHENG YU (Autor:in) / NIU QUNGUI (Autor:in) / ZHANG TIAN (Autor:in)
01.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-precision equipment foundation embedded part construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Amusement equipment foundation embedded part positioning and mounting construction method
Europäisches Patentamt | 2021
|Structural equipment foundation embedded part mounting method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|