High-precision equipment foundation embedded part construction method
The invention provides a high-precision equipment foundation embedded part construction method, and belongs to the technical field of construction construction.The high-precision equipment foundation embedded part construction method comprises the following steps that an overall support of four sets of embedded parts is machined; assembling three groups of brackets at the bottom on site, installing anchor bolts, and positioning and measuring the installed anchor bolts; spot welding is conducted on the temporary fixing anchor bolts; retesting the anchor bolt; finally positioning the remeasured anchor bolt, repeating the measurement, placing a position line on a cushion layer, and installing an embedded plate; placing the integral support in place, and welding and fixing the integral support; the positions of the anchor bolts and the elevation of the embedded plate are remeasured, and steel bars and formworks are installed after remeasurement; carrying out positioning measurement on the anchor bolt again; foundation pouring is conducted on the bottom, and after pouring is completed, the anchor bolt is measured again; carrying out self-compacting concrete pouring on the bottom; retesting of steel bar and formwork construction is conducted, and concrete is poured for the first time; re-measuring the position of the embedded part; and self-compacting compensation concrete is poured, and the problem that an existing construction method is not high in precision can be solved.
本发明提供了一种高精度设备基础埋件施工工法,属于施工建筑技术领域,该高精度设备基础埋件施工工法包括以下步骤:加工四组组埋件的整体支架;现场拼装底部三组支架、安装锚栓并对安装锚栓定位测量;对临时固定锚栓点焊;对锚栓进行复测;对复测后锚栓进行最后定位,同时重复测量,在垫层放位置线、安装埋板;将整体支架就位,对整体支架焊接固定;对锚栓位置及埋板标高进行复测,复测之后进行钢筋和模板的安装;再次对锚栓进行定位测量;对底部进行基础浇筑,浇筑完成后再次对锚栓进行复测;对底部进行自密实混凝土浇筑;进行钢筋、模板施工复测,浇筑第一次混凝土;复测埋件位置;浇灌自密实补偿混凝土,能够解决现有施工方法精度不高的问题。
High-precision equipment foundation embedded part construction method
The invention provides a high-precision equipment foundation embedded part construction method, and belongs to the technical field of construction construction.The high-precision equipment foundation embedded part construction method comprises the following steps that an overall support of four sets of embedded parts is machined; assembling three groups of brackets at the bottom on site, installing anchor bolts, and positioning and measuring the installed anchor bolts; spot welding is conducted on the temporary fixing anchor bolts; retesting the anchor bolt; finally positioning the remeasured anchor bolt, repeating the measurement, placing a position line on a cushion layer, and installing an embedded plate; placing the integral support in place, and welding and fixing the integral support; the positions of the anchor bolts and the elevation of the embedded plate are remeasured, and steel bars and formworks are installed after remeasurement; carrying out positioning measurement on the anchor bolt again; foundation pouring is conducted on the bottom, and after pouring is completed, the anchor bolt is measured again; carrying out self-compacting concrete pouring on the bottom; retesting of steel bar and formwork construction is conducted, and concrete is poured for the first time; re-measuring the position of the embedded part; and self-compacting compensation concrete is poured, and the problem that an existing construction method is not high in precision can be solved.
本发明提供了一种高精度设备基础埋件施工工法,属于施工建筑技术领域,该高精度设备基础埋件施工工法包括以下步骤:加工四组组埋件的整体支架;现场拼装底部三组支架、安装锚栓并对安装锚栓定位测量;对临时固定锚栓点焊;对锚栓进行复测;对复测后锚栓进行最后定位,同时重复测量,在垫层放位置线、安装埋板;将整体支架就位,对整体支架焊接固定;对锚栓位置及埋板标高进行复测,复测之后进行钢筋和模板的安装;再次对锚栓进行定位测量;对底部进行基础浇筑,浇筑完成后再次对锚栓进行复测;对底部进行自密实混凝土浇筑;进行钢筋、模板施工复测,浇筑第一次混凝土;复测埋件位置;浇灌自密实补偿混凝土,能够解决现有施工方法精度不高的问题。
High-precision equipment foundation embedded part construction method
一种高精度设备基础埋件施工工法
YANG XIONG (Autor:in) / SUN HAO (Autor:in) / LI XIANGLONG (Autor:in) / LI BAOCHENG (Autor:in) / LI MENG (Autor:in) / DU MAOXIAN (Autor:in) / QIAO YULE (Autor:in) / LIU BICHENG (Autor:in) / ZOU JIULONG (Autor:in) / ZHANG PENGFEI (Autor:in)
28.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Construction method for equipment foundation provided with large embedded part
Europäisches Patentamt | 2021
|Amusement equipment foundation embedded part positioning and mounting construction method
Europäisches Patentamt | 2021
|Ultrahigh-precision embedded part construction method
Europäisches Patentamt | 2022
|Construction method of high-precision equipment foundation bearing terrace
Europäisches Patentamt | 2023
|