Method for constructing cofferdam by bagging sandy soil and cofferdam constructed by using same
The invention relates to a method for constructing a cofferdam by bagging sandy soil. The method for constructing the cofferdam by bagging the sandy soil comprises the following steps of 1, building atemporary cofferdam: inserting timber piles inserted into the side, facing a riverway, of a river bank to build the temporary cofferdam; 2, excavating river bank sandy soil: excavating the sandy soilon the river bank by adopting an excavator; 3, bagging the sandy soil: packaging the sandy soil into bags; 4, building a cofferdam: backfilling the bagged sandy soil to the river bank; and 5, dismantling the temporary cofferdam: dismantling the timber piles to dismantle the temporary cofferdam. The method for constructing the cofferdam by bagging the sandy soil has the advantages that sandy soilis bagged, the movement space of the sandy soil is limited, and therefore, the loss of the sandy soil is reduced.
本申请涉及一种砂性土装袋修筑围堰的方法,包括如下步骤:步骤1:搭建临时围堰,在河岸朝向河道一侧插设木桩建造临时围堰;步骤2:挖取河岸砂土;采用挖机将河岸的砂土进行挖取;步骤3:砂土装袋,将砂土进行打包装袋;步骤4:搭建围堰,将装袋后的砂土回填会河岸;步骤5:拆除临时围堰,拆除木桩将临时围堰拆除。本申请具有通过对砂土进行装袋,限制了砂土的运动空间,从而降低了砂土的流失的效果。
Method for constructing cofferdam by bagging sandy soil and cofferdam constructed by using same
The invention relates to a method for constructing a cofferdam by bagging sandy soil. The method for constructing the cofferdam by bagging the sandy soil comprises the following steps of 1, building atemporary cofferdam: inserting timber piles inserted into the side, facing a riverway, of a river bank to build the temporary cofferdam; 2, excavating river bank sandy soil: excavating the sandy soilon the river bank by adopting an excavator; 3, bagging the sandy soil: packaging the sandy soil into bags; 4, building a cofferdam: backfilling the bagged sandy soil to the river bank; and 5, dismantling the temporary cofferdam: dismantling the timber piles to dismantle the temporary cofferdam. The method for constructing the cofferdam by bagging the sandy soil has the advantages that sandy soilis bagged, the movement space of the sandy soil is limited, and therefore, the loss of the sandy soil is reduced.
本申请涉及一种砂性土装袋修筑围堰的方法,包括如下步骤:步骤1:搭建临时围堰,在河岸朝向河道一侧插设木桩建造临时围堰;步骤2:挖取河岸砂土;采用挖机将河岸的砂土进行挖取;步骤3:砂土装袋,将砂土进行打包装袋;步骤4:搭建围堰,将装袋后的砂土回填会河岸;步骤5:拆除临时围堰,拆除木桩将临时围堰拆除。本申请具有通过对砂土进行装袋,限制了砂土的运动空间,从而降低了砂土的流失的效果。
Method for constructing cofferdam by bagging sandy soil and cofferdam constructed by using same
一种砂性土装袋修筑围堰的方法及该方法修筑的围堰
CHE WEIYIN (Autor:in)
12.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
COFFERDAM STRUCTURE AND COFFERDAM METHOD USING THE SAME
Europäisches Patentamt | 2015
|COFFERDAM STRUCTURE AND COFFERDAM METHOD USING THE SAME
Europäisches Patentamt | 2019
|Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|TEMPORARY COFFERDAM METHOD, TEMPORARY COFFERDAM STRUCTURE
Europäisches Patentamt | 2022
|Adjustable cofferdam structure and cofferdam construction method
Europäisches Patentamt | 2023
|