Rectangular-section anti-slide pile combined mechanical pore-forming construction method
The invention belongs to the field of engineering, and particularly relates to a rectangular-section anti-slide pile combined mechanical pore-forming construction method. The rectangular-section anti-slide pile combined mechanical pore-forming construction method comprises the steps of construction preparation, construction measurement, pile casing burying, pile driver in-place, impact pore-forming, steel bar manufacturing and mounting, concrete pouring in a hole and the like. The rectangular-section anti-slide pile combined mechanical pore-forming construction method is characterized in thaton the basis of circular impact drill pore-forming, a rectangular drill bit is adopted for trimming surrounding soil, mechanical pore-forming of the rectangular-section anti-slide pile is achieved, cost can be saved to a large extent, and the construction progress can be improved to a large extent.
本发明属于工程领域,尤其是一种矩形截面抗滑桩组合机械成孔施工方法,包括施工准备,施工测量,埋设护筒,桩机就位,冲击成孔,钢筋制作与安装,孔内混凝土浇筑等步骤,其特征在于在圆形冲击钻成孔的基础上,采用矩形钻头对周围土体进行修整,实现矩形截面抗滑桩机械成孔,能够在很大程度上节约成本和提高施工进度。
Rectangular-section anti-slide pile combined mechanical pore-forming construction method
The invention belongs to the field of engineering, and particularly relates to a rectangular-section anti-slide pile combined mechanical pore-forming construction method. The rectangular-section anti-slide pile combined mechanical pore-forming construction method comprises the steps of construction preparation, construction measurement, pile casing burying, pile driver in-place, impact pore-forming, steel bar manufacturing and mounting, concrete pouring in a hole and the like. The rectangular-section anti-slide pile combined mechanical pore-forming construction method is characterized in thaton the basis of circular impact drill pore-forming, a rectangular drill bit is adopted for trimming surrounding soil, mechanical pore-forming of the rectangular-section anti-slide pile is achieved, cost can be saved to a large extent, and the construction progress can be improved to a large extent.
本发明属于工程领域,尤其是一种矩形截面抗滑桩组合机械成孔施工方法,包括施工准备,施工测量,埋设护筒,桩机就位,冲击成孔,钢筋制作与安装,孔内混凝土浇筑等步骤,其特征在于在圆形冲击钻成孔的基础上,采用矩形钻头对周围土体进行修整,实现矩形截面抗滑桩机械成孔,能够在很大程度上节约成本和提高施工进度。
Rectangular-section anti-slide pile combined mechanical pore-forming construction method
矩形截面抗滑桩组合机械成孔施工方法
WANG ZAIHANG (Autor:in) / WANG JIANCANG (Autor:in) / LI HONGGANG (Autor:in) / WEI LONGSHENG (Autor:in) / WANG LIJUN (Autor:in)
15.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Soft soil section rectangular anti-slide pile forming method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Combined anti-slide pile structure construction method
Europäisches Patentamt | 2022
|