Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation leveling process for building construction
The invention discloses a foundation leveling process for building construction in the technical field of land leveling, and relates to a foundation leveling process for building construction. Leveling equipment suitable for the process comprises a top plate; a pushing handle is fixedly connected with the right end of the top of the top plate, and a vehicle frame is fixedly connected with the right end of the bottom of the top plate; the left end of the vehicle frame is connected with a rolling wheel, and the right end of the vehicle frame is connected with a power mechanism to make the leveling equipment move; and the bottom left end of the top plate is fixedly connected with a ground-breaking mechanism. According to the foundation leveling process for building construction, by arranginga dozer blade, a soil cutting mechanism, a soil crushing mechanism and a soil spreading mechanism, on the one hand, the purpose of completing foundation leveling through one-time rolling compaction can be achieved, multiple times of rolling compaction are not needed, and working time is reduced; and on the other hand, manual treatment is not needed, protruding soil blocks are automatically shoveled and smashed and are evenly scattered on the ground, and the workload of workers is reduced.
本发明公开了土地平整技术领域的一种建筑施工用地基平整工艺,一种建筑施工用地基平整工艺,适用于该工艺的平整设备包括顶板,所述顶部顶部右端固定连接有推动把手,所述顶板底部右端固定连接有车架,所述车架左端转动连接有碾轮,所述车架右端转动连接有使平整设备移动的动力机构,所述顶板底部左端固定连接破土机构,本发明通过设置推土铲、切土机构、碎土机构、撒土机构,一方面可实现一次碾压完成平整地基的目的,无需多次碾压,降低工作时间,另一方面无需人工处理,将凸出的土块自动进行铲除并进行粉碎,均匀洒在地面,减少工人工作量。
Foundation leveling process for building construction
The invention discloses a foundation leveling process for building construction in the technical field of land leveling, and relates to a foundation leveling process for building construction. Leveling equipment suitable for the process comprises a top plate; a pushing handle is fixedly connected with the right end of the top of the top plate, and a vehicle frame is fixedly connected with the right end of the bottom of the top plate; the left end of the vehicle frame is connected with a rolling wheel, and the right end of the vehicle frame is connected with a power mechanism to make the leveling equipment move; and the bottom left end of the top plate is fixedly connected with a ground-breaking mechanism. According to the foundation leveling process for building construction, by arranginga dozer blade, a soil cutting mechanism, a soil crushing mechanism and a soil spreading mechanism, on the one hand, the purpose of completing foundation leveling through one-time rolling compaction can be achieved, multiple times of rolling compaction are not needed, and working time is reduced; and on the other hand, manual treatment is not needed, protruding soil blocks are automatically shoveled and smashed and are evenly scattered on the ground, and the workload of workers is reduced.
本发明公开了土地平整技术领域的一种建筑施工用地基平整工艺,一种建筑施工用地基平整工艺,适用于该工艺的平整设备包括顶板,所述顶部顶部右端固定连接有推动把手,所述顶板底部右端固定连接有车架,所述车架左端转动连接有碾轮,所述车架右端转动连接有使平整设备移动的动力机构,所述顶板底部左端固定连接破土机构,本发明通过设置推土铲、切土机构、碎土机构、撒土机构,一方面可实现一次碾压完成平整地基的目的,无需多次碾压,降低工作时间,另一方面无需人工处理,将凸出的土块自动进行铲除并进行粉碎,均匀洒在地面,减少工人工作量。
Foundation leveling process for building construction
一种建筑施工用地基平整工艺
LIANG GUIQING (Autor:in)
15.01.2021
Patent
Elektronische Ressource
Chinesisch
Foundation leveling process for building construction
Europäisches Patentamt | 2021
|Foundation leveling device for airport building construction
Europäisches Patentamt | 2023
|Efficient foundation leveling equipment for building construction
Europäisches Patentamt | 2020
|