Foundation leveling process for building construction
The invention relates to the technical field of foundation leveling processes, in particular to a foundation leveling process for building construction. The foundation leveling process comprises the following steps that S1, preliminary wetting treatment is carried out; S2, the surface layer of a foundation is air-dried; S3, slicking treatment is carried out; S4, preliminary flattening treatment is carried out; S5, secondary wetting treatment is carried out; and S6, repairing and flattening treatment is carried out. When the foundation leveling process for building construction is implemented, raised dust can be effectively reduced through preliminary wetting, air drying of the surface layer of the foundation is used for avoiding the situation that the surface layer of the foundation is too wet, the viscosity of soil is large, and leveling operation is affected, and the purpose of secondary wetting treatment is to check some positions which are not tightly pressed enough, so that hidden dangers are avoided. The whole leveling process construction process is convenient and fast, raised dust is not prone to being generated, and application and popularization are facilitated.
本发明涉及地基平整工艺技术领域,尤其涉及一种建筑施工用地基平整工艺,包括以下步骤:S1、初步润湿处理;S2、地基表层风干;S3、刮平处理;S4、初步压平处理;S5、二次润湿处理;S6、修补压平处理,该平整工艺实施时,通过初步润湿能够有效的减少扬尘,地基表层风干是避免地基表层过于湿润,土壤的黏性大,影响刮平操作,二次润湿处理的目的是,排查出一些压的不够紧实的位置,避免留下隐患,整个平整工艺施工过程方便快捷,不易产生扬尘,适合推广使用。
Foundation leveling process for building construction
The invention relates to the technical field of foundation leveling processes, in particular to a foundation leveling process for building construction. The foundation leveling process comprises the following steps that S1, preliminary wetting treatment is carried out; S2, the surface layer of a foundation is air-dried; S3, slicking treatment is carried out; S4, preliminary flattening treatment is carried out; S5, secondary wetting treatment is carried out; and S6, repairing and flattening treatment is carried out. When the foundation leveling process for building construction is implemented, raised dust can be effectively reduced through preliminary wetting, air drying of the surface layer of the foundation is used for avoiding the situation that the surface layer of the foundation is too wet, the viscosity of soil is large, and leveling operation is affected, and the purpose of secondary wetting treatment is to check some positions which are not tightly pressed enough, so that hidden dangers are avoided. The whole leveling process construction process is convenient and fast, raised dust is not prone to being generated, and application and popularization are facilitated.
本发明涉及地基平整工艺技术领域,尤其涉及一种建筑施工用地基平整工艺,包括以下步骤:S1、初步润湿处理;S2、地基表层风干;S3、刮平处理;S4、初步压平处理;S5、二次润湿处理;S6、修补压平处理,该平整工艺实施时,通过初步润湿能够有效的减少扬尘,地基表层风干是避免地基表层过于湿润,土壤的黏性大,影响刮平操作,二次润湿处理的目的是,排查出一些压的不够紧实的位置,避免留下隐患,整个平整工艺施工过程方便快捷,不易产生扬尘,适合推广使用。
Foundation leveling process for building construction
一种建筑施工用地基平整工艺
WANG XIUFANG (Autor:in) / WANG MEIXIANG (Autor:in) / WANG XINFENG (Autor:in) / JIANG YOUCHENG (Autor:in)
10.08.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation leveling process for building construction
Europäisches Patentamt | 2021
|Foundation leveling device for airport building construction
Europäisches Patentamt | 2023
|Efficient foundation leveling equipment for building construction
Europäisches Patentamt | 2020
|