Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel plate combined shear wall bolt splicing joint and shear wall
The invention relates to a steel plate combined shear wall bolt splicing joint and a shear wall. The steel plate combined shear wall bolt splicing joint comprises upper wall sections, lower wall sections arranged below the upper wall sections and connecting mechanisms. The connecting mechanisms comprise connecting plate sets and fastening connecting assemblies, first assembling holes are formed inthe connecting plate sets, the connecting plate sets are arranged on ones of the upper wall sections and the lower wall sections, second assembling holes opposite to the first assembling holes are formed in the others of the upper wall sections and the lower wall sections, and the fastening connecting assemblies are inserted into the first assembling holes and the second assembling holes so as toassemble and fix the upper wall sections and the lower wall sections. According to the scheme, the skill requirements for operators are low, feasibility and operability are high, the splicing qualitycan be guaranteed easily, meanwhile, live-line open fire operation does not exist, and the safety risk can be fundamentally eliminated; and in addition, the splicing joint structure in the scheme isconvenient and fast to assemble, time and labor are saved, the shear wall construction efficiency can be greatly improved, and the enterprise economical efficiency is improved.
本发明涉及一种钢板组合剪力墙螺栓拼接节点及剪力墙,包括:上墙段;下墙段,下墙段设置于上墙段的下方;以及连接机构,连接机构包括连接板组和紧固连接组件,连接板组开设有第一装配孔,且连接板组设置于上墙段与下墙段的其中之一上,上墙段与下墙段的其中另一开设有与第一装配孔相对的第二装配孔,紧固连接组件插置于第一装配孔和第二装配孔中,以将上墙段与下墙段组装固定。本方案不仅对操作人员的技术要求低,可实施性和可操作性强,有助于保证拼接质量,同时不存在带电明火作业,可从根本上消除安全风险;此外,本方案的拼接节点结构组装方便快捷,省时省力,可大幅提升剪力墙施工建造效率,提升企业经济性。
Steel plate combined shear wall bolt splicing joint and shear wall
The invention relates to a steel plate combined shear wall bolt splicing joint and a shear wall. The steel plate combined shear wall bolt splicing joint comprises upper wall sections, lower wall sections arranged below the upper wall sections and connecting mechanisms. The connecting mechanisms comprise connecting plate sets and fastening connecting assemblies, first assembling holes are formed inthe connecting plate sets, the connecting plate sets are arranged on ones of the upper wall sections and the lower wall sections, second assembling holes opposite to the first assembling holes are formed in the others of the upper wall sections and the lower wall sections, and the fastening connecting assemblies are inserted into the first assembling holes and the second assembling holes so as toassemble and fix the upper wall sections and the lower wall sections. According to the scheme, the skill requirements for operators are low, feasibility and operability are high, the splicing qualitycan be guaranteed easily, meanwhile, live-line open fire operation does not exist, and the safety risk can be fundamentally eliminated; and in addition, the splicing joint structure in the scheme isconvenient and fast to assemble, time and labor are saved, the shear wall construction efficiency can be greatly improved, and the enterprise economical efficiency is improved.
本发明涉及一种钢板组合剪力墙螺栓拼接节点及剪力墙,包括:上墙段;下墙段,下墙段设置于上墙段的下方;以及连接机构,连接机构包括连接板组和紧固连接组件,连接板组开设有第一装配孔,且连接板组设置于上墙段与下墙段的其中之一上,上墙段与下墙段的其中另一开设有与第一装配孔相对的第二装配孔,紧固连接组件插置于第一装配孔和第二装配孔中,以将上墙段与下墙段组装固定。本方案不仅对操作人员的技术要求低,可实施性和可操作性强,有助于保证拼接质量,同时不存在带电明火作业,可从根本上消除安全风险;此外,本方案的拼接节点结构组装方便快捷,省时省力,可大幅提升剪力墙施工建造效率,提升企业经济性。
Steel plate combined shear wall bolt splicing joint and shear wall
钢板组合剪力墙螺栓拼接节点及剪力墙
ZHANG LIPING (Autor:in)
15.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Steel plate shear wall unit and modular combined steel plate shear wall
Europäisches Patentamt | 2024
|Bolt type prefabricated shear wall vertical mixed connection joint
Europäisches Patentamt | 2022
|