Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integrated climbing frame system and assembling method thereof
The invention provides an integrated climbing frame system and an assembling method thereof. The climbing frame system comprises a base scaffold board and a plurality of upper scaffold boards, whereinthe base scaffold board is clamped between a plurality of leveling short pipes and a plurality of steel pipe fasteners; the inner side of the base scaffold board is fixedly connected with a turning plate through a connecting plate; the turning plate is in sealed lap joint with a building board layer; a plurality of inner ring vertical rods and a plurality of outer ring vertical rods are uniformlyarranged on the base scaffold board; the outer ring vertical rods are fixedly connected through horizontal trusses; the horizontal trusses are positioned at the inner sides of the outer ring verticalrods; the upper scaffold boards are parallelly fixed between the inner ring vertical rods and the outer ring vertical rods at equal intervals; a plurality of net sheets are paved at the outer sides of the outer ring vertical rods in a splicing form; the inner peripheries of the base scaffold board and the upper scaffold boards are vertically connected with a plurality of guide rails; a guide railsupport element is fixedly connected between any outer ring vertical rod and the guide rail; the inner side of the guide rail is connected with a plurality of wall attaching fixing guide seats; and the wall attaching fixing guide seats are fixed on the outer wall surface of the corresponding building board layer.
本发明提供了一种集成式爬架系统及其装配方法,爬架系统包括基层脚手板和若干上层脚手板,基层脚手板夹设于若干找平短管和若干钢管扣件之间,基层脚手板的内侧通过连接板固连翻板,翻板与其一建筑板层形成密封搭接,基层脚手板上均匀设置若干内圈立杆和若干外圈立杆,外圈立杆之间通过水平桁架固连,水平桁架位于若干外圈立杆的内侧,若干内圈立杆和若干外圈立杆之间等间距平行固定若干上层脚手板,若干外圈立杆的外侧按照拼合形式铺满若干网片,基层脚手板和若干上层脚手板的内周竖立连接若干导轨,任一外圈立杆与导轨之间固连导轨支撑件,导轨的内侧连接若干附墙固定导向座,附墙固定导向座固定在对应建筑板层的外墙面上。
Integrated climbing frame system and assembling method thereof
The invention provides an integrated climbing frame system and an assembling method thereof. The climbing frame system comprises a base scaffold board and a plurality of upper scaffold boards, whereinthe base scaffold board is clamped between a plurality of leveling short pipes and a plurality of steel pipe fasteners; the inner side of the base scaffold board is fixedly connected with a turning plate through a connecting plate; the turning plate is in sealed lap joint with a building board layer; a plurality of inner ring vertical rods and a plurality of outer ring vertical rods are uniformlyarranged on the base scaffold board; the outer ring vertical rods are fixedly connected through horizontal trusses; the horizontal trusses are positioned at the inner sides of the outer ring verticalrods; the upper scaffold boards are parallelly fixed between the inner ring vertical rods and the outer ring vertical rods at equal intervals; a plurality of net sheets are paved at the outer sides of the outer ring vertical rods in a splicing form; the inner peripheries of the base scaffold board and the upper scaffold boards are vertically connected with a plurality of guide rails; a guide railsupport element is fixedly connected between any outer ring vertical rod and the guide rail; the inner side of the guide rail is connected with a plurality of wall attaching fixing guide seats; and the wall attaching fixing guide seats are fixed on the outer wall surface of the corresponding building board layer.
本发明提供了一种集成式爬架系统及其装配方法,爬架系统包括基层脚手板和若干上层脚手板,基层脚手板夹设于若干找平短管和若干钢管扣件之间,基层脚手板的内侧通过连接板固连翻板,翻板与其一建筑板层形成密封搭接,基层脚手板上均匀设置若干内圈立杆和若干外圈立杆,外圈立杆之间通过水平桁架固连,水平桁架位于若干外圈立杆的内侧,若干内圈立杆和若干外圈立杆之间等间距平行固定若干上层脚手板,若干外圈立杆的外侧按照拼合形式铺满若干网片,基层脚手板和若干上层脚手板的内周竖立连接若干导轨,任一外圈立杆与导轨之间固连导轨支撑件,导轨的内侧连接若干附墙固定导向座,附墙固定导向座固定在对应建筑板层的外墙面上。
Integrated climbing frame system and assembling method thereof
一种集成式爬架系统及其装配方法
WU ZECHEN (Autor:in) / ZHONG SONGXING (Autor:in) / ZHANG YANGCHUAN (Autor:in) / LIN YUPENG (Autor:in)
15.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Assembling device and assembling method for frame body unit of climbing frame
Europäisches Patentamt | 2024
|Novel climbing frame turning plate protection device and assembling method thereof
Europäisches Patentamt | 2024
|Self-climbing protection frame and climbing method thereof
Europäisches Patentamt | 2021
|Integrated lifting climbing frame and construction technology thereof
Europäisches Patentamt | 2024
|