Refined construction steel beam and column connecting joint
The invention relates to a refined construction steel beam and column connecting joint, the connecting joint comprises a rectangular steel column with a column end cap, an H-shaped steel column is arranged on the upper portion of the rectangular steel column with the column end cap, H-shaped steel beams with end plates are arranged on the periphery of the H-shaped steel column, and all the components are connected through high-strength bolts. The connecting joint meets the mechanical property, and also meets requirements of people for the space of longitudinal and transverse spans at the present stage, efficient construction is easier to achieve, the structural construction form is unique, the structure is easy to install or replace, when a certain component cannot be normally used in theservice period, rapid replacement can be achieved, the maintenance cost is reduced, rapid construction can be achieved, meanwhile, the workload of constructors is reduced, green buildings are better facilitated, the construction efficiency is improved, and refined construction can be achieved; and furthermore, the structural components are all mechanically designed and industrially produced, the components are precise and accurate, machining errors hardly exist, work can be completed only by hoisting and screwing bolts on site, the workload of workers is reduced, and the engineering quality and the working efficiency are improved, and refined construction can be achieved.
一种精细化施工钢梁柱连接节点,包括带柱端帽的矩形钢柱,所述带柱端帽的矩形钢柱上部设置有H型钢柱,所述H型型钢柱四周有带有端板的H型钢梁,它们之间均由高强螺栓连接,所述连接节点不仅满足力学特性,还能够满足现阶段人们对纵横跨度的空间的需求,更易于达到高效率施工,而结构构造形式独特,结构易于安装或更换,当某个构件在服役期不能正常使用,可以实现快速更换,不仅减少维护成本,而且还可以实现快速施工,同时降低了施工人员的工作量,更有利于绿色建筑,提高了施工效率,可以达到精细化施工,然后结构构件均由机械设计和工厂化生产的,构件比较精密准确,几乎没有加工误差,现场只需吊装和拧紧螺栓就可以完成工作,减少工人的工作量,提高了工程质量和工作效率,可以达到精细化施工。
Refined construction steel beam and column connecting joint
The invention relates to a refined construction steel beam and column connecting joint, the connecting joint comprises a rectangular steel column with a column end cap, an H-shaped steel column is arranged on the upper portion of the rectangular steel column with the column end cap, H-shaped steel beams with end plates are arranged on the periphery of the H-shaped steel column, and all the components are connected through high-strength bolts. The connecting joint meets the mechanical property, and also meets requirements of people for the space of longitudinal and transverse spans at the present stage, efficient construction is easier to achieve, the structural construction form is unique, the structure is easy to install or replace, when a certain component cannot be normally used in theservice period, rapid replacement can be achieved, the maintenance cost is reduced, rapid construction can be achieved, meanwhile, the workload of constructors is reduced, green buildings are better facilitated, the construction efficiency is improved, and refined construction can be achieved; and furthermore, the structural components are all mechanically designed and industrially produced, the components are precise and accurate, machining errors hardly exist, work can be completed only by hoisting and screwing bolts on site, the workload of workers is reduced, and the engineering quality and the working efficiency are improved, and refined construction can be achieved.
一种精细化施工钢梁柱连接节点,包括带柱端帽的矩形钢柱,所述带柱端帽的矩形钢柱上部设置有H型钢柱,所述H型型钢柱四周有带有端板的H型钢梁,它们之间均由高强螺栓连接,所述连接节点不仅满足力学特性,还能够满足现阶段人们对纵横跨度的空间的需求,更易于达到高效率施工,而结构构造形式独特,结构易于安装或更换,当某个构件在服役期不能正常使用,可以实现快速更换,不仅减少维护成本,而且还可以实现快速施工,同时降低了施工人员的工作量,更有利于绿色建筑,提高了施工效率,可以达到精细化施工,然后结构构件均由机械设计和工厂化生产的,构件比较精密准确,几乎没有加工误差,现场只需吊装和拧紧螺栓就可以完成工作,减少工人的工作量,提高了工程质量和工作效率,可以达到精细化施工。
Refined construction steel beam and column connecting joint
一种精细化施工钢梁柱连接节点
LIU HAIQING (Autor:in) / JIAN XIANGYANG (Autor:in) / ZHAO ZHONGWEI (Autor:in) / WU XIUFENG (Autor:in) / WANG YUNLONG (Autor:in) / DONG JINFENG (Autor:in) / LEI MING (Autor:in) / CHEN ZIMU (Autor:in) / LIU WENWU (Autor:in) / CHENG YANG (Autor:in)
26.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Europäisches Patentamt | 2024
|Construction method of steel structure beam-column connecting joint
Europäisches Patentamt | 2020
|Ring beam steel pipe pile column joint connecting method for beam column joint in construction
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|