Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mortar bucket for building wall building
The invention discloses a mortar bucket for building wall building. The mortar bucket comprises a mortar bucket body. A mortar bucket brim is fixedly installed on the edge of the upper surface of themortar bucket body. First through holes are formed in the symmetrical positions of the surface of the mortar bucket brim. A bearing steel circle is fixedly installed on the lower surface of the mortarbucket brim. Second through holes are formed in the symmetrical positions of the surface of the bearing steel circle. Connecting plate blocks are installed in the second through holes in a penetrating mode. Limiting caps are fixedly installed on the lower surfaces of the connecting plate blocks. Third through holes are formed in the positions, close to the upper ends, of the surfaces of the connecting plate blocks. Bearing steel rings are movably connected and installed on the surface of the connecting plate blocks. According to the mortar bucket for building wall building, the bearing capacity of the mortar bucket can be improved, the situation that the mortar bucket brim is damaged due to the fact that stress is concentrated on one point can be prevented, the connecting plate blocks canbe detached to be replaced, in this way, overall replacement can be reduced, and the purchasing cost is saved.
本发明公开了一种建筑砌墙用砂浆桶,包括砂浆桶体,所述砂浆桶体的上表面边缘处固定安装有砂浆桶檐,所述砂浆桶檐的表面对称位置均开设有一号通孔,所述砂浆桶檐的下表面固定安装有承重钢圈,所述承重钢圈的表面对称位置均开设有二号通孔,所述二号通孔的内部均穿插安装有连接板块,所述连接板块的下表面均固定安装有限位帽,所述连接板块的表面靠近上端位置均开设有三号通孔,所述连接板块的表面活动连接安装有承重钢环。本发明所述的一种建筑砌墙用砂浆桶,能够提高砂浆桶的承重能力,并且可防止砂浆桶檐受力集中于一点导致破损,还可将连接板块拆卸下来更换,这样便可减少对整体的更换,节省购买成本。
Mortar bucket for building wall building
The invention discloses a mortar bucket for building wall building. The mortar bucket comprises a mortar bucket body. A mortar bucket brim is fixedly installed on the edge of the upper surface of themortar bucket body. First through holes are formed in the symmetrical positions of the surface of the mortar bucket brim. A bearing steel circle is fixedly installed on the lower surface of the mortarbucket brim. Second through holes are formed in the symmetrical positions of the surface of the bearing steel circle. Connecting plate blocks are installed in the second through holes in a penetrating mode. Limiting caps are fixedly installed on the lower surfaces of the connecting plate blocks. Third through holes are formed in the positions, close to the upper ends, of the surfaces of the connecting plate blocks. Bearing steel rings are movably connected and installed on the surface of the connecting plate blocks. According to the mortar bucket for building wall building, the bearing capacity of the mortar bucket can be improved, the situation that the mortar bucket brim is damaged due to the fact that stress is concentrated on one point can be prevented, the connecting plate blocks canbe detached to be replaced, in this way, overall replacement can be reduced, and the purchasing cost is saved.
本发明公开了一种建筑砌墙用砂浆桶,包括砂浆桶体,所述砂浆桶体的上表面边缘处固定安装有砂浆桶檐,所述砂浆桶檐的表面对称位置均开设有一号通孔,所述砂浆桶檐的下表面固定安装有承重钢圈,所述承重钢圈的表面对称位置均开设有二号通孔,所述二号通孔的内部均穿插安装有连接板块,所述连接板块的下表面均固定安装有限位帽,所述连接板块的表面靠近上端位置均开设有三号通孔,所述连接板块的表面活动连接安装有承重钢环。本发明所述的一种建筑砌墙用砂浆桶,能够提高砂浆桶的承重能力,并且可防止砂浆桶檐受力集中于一点导致破损,还可将连接板块拆卸下来更换,这样便可减少对整体的更换,节省购买成本。
Mortar bucket for building wall building
一种建筑砌墙用砂浆桶
02.02.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Mortar shoveling equipment for building wall decoration
Europäisches Patentamt | 2020
|