Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Civil engineering green construction system
The invention discloses a civil engineering green construction system, and the system comprises a box body; a fan-shaped air inlet is fixedly connected to the upper end of the box body, a plurality ofdust removal water sprayers are rotatably connected to a front cover of the box body, a water storage tank is fixedly connected to the bottom end of the box body, the water storage tank is connectedto the dust removal water sprayers, and an air bellow partition plate is fixedly connected into the box body; an air draft fan is fixedly connected to the air bellow partition plate, an air outlet isfixed to the upper end of the air bellow partition plate, a plurality of flow guide grooves are fixedly connected to the air bellow partition plate, flow guide water outlet grooves are formed in one sides of the flow guide grooves, and precipitation grooves are fixedly connected to the lower ends of the flow guide grooves. .The lower end of the precipitation tank is fixedly connected with a sludgeoutlet tank fixedly connected with the air bellow partition plate, a sludge inlet is formed in the upper end face of the sludge outlet tank, a sludge removal scraper is slidably connected into the precipitation tank and fixedly connected with a conveying rod slidably connected to the upper end of the sludge outlet tank, and a plurality of vertically-through conveying grooves are fixedly connectedinto the conveying rod. According to the invention, the problem of great waste of a water source is solved.
本发明公开了土木工程绿色施工系统,包括箱体,箱体上端固定连接有扇形进风口,箱体前盖上转动连接有多个除尘喷水器,箱体底端固定连接有储水箱,储水箱连接至除尘喷水器,箱体内部固定连接有风箱隔板,风箱隔板上固定连接有抽风风扇,风箱隔板上端固定有出风口,风箱隔板上固定连接有多个导流槽,导流槽一侧开设有导流出水槽,导流槽下端固定连接有沉淀槽,沉淀槽下底面开设有多个出泥口,沉淀槽下端固定连接有和风箱隔板固定连接的出泥槽,出泥槽上端面开设有进泥口,沉淀槽内部滑动连接有除泥刮板,除泥刮板和滑动连接在出泥槽上端的传送杆固定连接,传送杆内部固定连接有多个上下贯通的运输槽;本发明解决了对水源造成极大的浪费的问题。
Civil engineering green construction system
The invention discloses a civil engineering green construction system, and the system comprises a box body; a fan-shaped air inlet is fixedly connected to the upper end of the box body, a plurality ofdust removal water sprayers are rotatably connected to a front cover of the box body, a water storage tank is fixedly connected to the bottom end of the box body, the water storage tank is connectedto the dust removal water sprayers, and an air bellow partition plate is fixedly connected into the box body; an air draft fan is fixedly connected to the air bellow partition plate, an air outlet isfixed to the upper end of the air bellow partition plate, a plurality of flow guide grooves are fixedly connected to the air bellow partition plate, flow guide water outlet grooves are formed in one sides of the flow guide grooves, and precipitation grooves are fixedly connected to the lower ends of the flow guide grooves. .The lower end of the precipitation tank is fixedly connected with a sludgeoutlet tank fixedly connected with the air bellow partition plate, a sludge inlet is formed in the upper end face of the sludge outlet tank, a sludge removal scraper is slidably connected into the precipitation tank and fixedly connected with a conveying rod slidably connected to the upper end of the sludge outlet tank, and a plurality of vertically-through conveying grooves are fixedly connectedinto the conveying rod. According to the invention, the problem of great waste of a water source is solved.
本发明公开了土木工程绿色施工系统,包括箱体,箱体上端固定连接有扇形进风口,箱体前盖上转动连接有多个除尘喷水器,箱体底端固定连接有储水箱,储水箱连接至除尘喷水器,箱体内部固定连接有风箱隔板,风箱隔板上固定连接有抽风风扇,风箱隔板上端固定有出风口,风箱隔板上固定连接有多个导流槽,导流槽一侧开设有导流出水槽,导流槽下端固定连接有沉淀槽,沉淀槽下底面开设有多个出泥口,沉淀槽下端固定连接有和风箱隔板固定连接的出泥槽,出泥槽上端面开设有进泥口,沉淀槽内部滑动连接有除泥刮板,除泥刮板和滑动连接在出泥槽上端的传送杆固定连接,传送杆内部固定连接有多个上下贯通的运输槽;本发明解决了对水源造成极大的浪费的问题。
Civil engineering green construction system
土木工程绿色施工系统
CHEN XIAOHONG (Autor:in) / ZHANG YUEYUE (Autor:in) / ZHONG HONGWEI (Autor:in) / LI WEI (Autor:in) / DI YINQIAO (Autor:in) / ZHU YONGCHAO (Autor:in) / QIN PENGFEI (Autor:in) / WU YU (Autor:in) / LI SONGTAO (Autor:in) / CHEN JINGYUAN (Autor:in)
09.02.2021
Patent
Elektronische Ressource
Chinesisch
Green construction in civil engineering instruction
IEEE | 2013
|CIVIL ENGINEERING CONSTRUCTION AND CONSTRUCTION METHOD OF CIVIL ENGINEERING CONSTRUCTION
Europäisches Patentamt | 2017
|Application of Green Building Materials in Civil Engineering Construction
DOAJ | 2021
|CIVIL ENGINEERING CONSTRUCTION METHOD AND CIVIL ENGINEERING CONSTRUCTION PROGRAM
Europäisches Patentamt | 2019
|Civil Engineering Construction
TIBKAT | 1986
|