Seepage well forming method
The invention provides a seepage well forming method. According to the method, hole forming can be reasonably carried out, and hydraulic connection between water-bearing strata of a place where a seepage well is located can be obtained through completed holes. The method comprises the steps that seepage holes and observation holes are distributed in a combined forming mode; pile casings are embedded in the positions of the distributed seepage holes; mud is prepared, and the prepared mud is placed in the pile casings for standby application; and hole opening operation is conducted according tothe arrangement positions of the seepage holes and the observation holes; According to the seepage well forming method, the seepage holes and the observation holes are reasonably distributed, a subsequent seepage scheme can be determined after the hydraulic connection between the water-bearing strata is better confirmed, in this way, water seepage and other treatment of the water-bearing strata can be completed before wheel-bucket operation, it is further guaranteed that a wheel bucket can be fully applied in work, the working efficiency is improved, and therefore the wheel-bucket efficiency is improved.
本发明提供了一种渗水井成型方法,该渗水井成型方法能够合理的进行成孔,并通过完成的孔获知所在地的含水层之间的水力联系;包括结合成型地进行渗水孔和观察孔的布设;在布设的渗水孔的位置埋置护筒;进行泥浆制备,并将制备完成的泥浆置于护筒内待用;根据渗水孔和观察孔的布设位置进行开孔操作;本发明提出的渗水井成型方法合理的进行渗水孔和观察孔的布设,能够在更好的确定含水层之间的水力联系进而进行后续的渗水方案确定,这样在轮斗作业前则可完成含水层的渗水等处理,进而保证轮斗在工作中能够得到充分的应用,进而提高轮斗的效率。
Seepage well forming method
The invention provides a seepage well forming method. According to the method, hole forming can be reasonably carried out, and hydraulic connection between water-bearing strata of a place where a seepage well is located can be obtained through completed holes. The method comprises the steps that seepage holes and observation holes are distributed in a combined forming mode; pile casings are embedded in the positions of the distributed seepage holes; mud is prepared, and the prepared mud is placed in the pile casings for standby application; and hole opening operation is conducted according tothe arrangement positions of the seepage holes and the observation holes; According to the seepage well forming method, the seepage holes and the observation holes are reasonably distributed, a subsequent seepage scheme can be determined after the hydraulic connection between the water-bearing strata is better confirmed, in this way, water seepage and other treatment of the water-bearing strata can be completed before wheel-bucket operation, it is further guaranteed that a wheel bucket can be fully applied in work, the working efficiency is improved, and therefore the wheel-bucket efficiency is improved.
本发明提供了一种渗水井成型方法,该渗水井成型方法能够合理的进行成孔,并通过完成的孔获知所在地的含水层之间的水力联系;包括结合成型地进行渗水孔和观察孔的布设;在布设的渗水孔的位置埋置护筒;进行泥浆制备,并将制备完成的泥浆置于护筒内待用;根据渗水孔和观察孔的布设位置进行开孔操作;本发明提出的渗水井成型方法合理的进行渗水孔和观察孔的布设,能够在更好的确定含水层之间的水力联系进而进行后续的渗水方案确定,这样在轮斗作业前则可完成含水层的渗水等处理,进而保证轮斗在工作中能够得到充分的应用,进而提高轮斗的效率。
Seepage well forming method
一种渗水井成型方法
MA JINGJIA (Autor:in) / LI YING (Autor:in) / LIU HAIXIAN (Autor:in) / WANG ZHONGXIN (Autor:in) / ZHANG HONG (Autor:in) / GUO QIANG (Autor:in) / XU YONGCHAO (Autor:in) / CHEN DAWEI (Autor:in) / SHI YONGSHENG (Autor:in) / LIANG YUANYUAN (Autor:in)
16.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
/
E02D
FOUNDATIONS
,
Gründungen
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
Seepage well, seepage well building method and improved erosion gully reclamation method