Irregular metal whole plate splicing installation construction process
The invention discloses an irregular metal whole plate splicing installation construction process. The process comprises the following steps that 1, an installation foundation is pretreated; 2, measuring and setting out are performed; 3, a base layer steel framework and an adjustable hanging piece are installed; 4, irregular metal plates are installed; and 5, an acceptance check stage is carried out. According to a modeling column or wall installed by adopting the construction process, the overall visual effect of the modeling wall and the modeling column is improved, meanwhile, installation materials are saved on, the installation cost is reduced, and the installation period is shortened.
本发明公开了一种不规则金属整板拼接安装施工工艺,其包括有如下步骤:步骤一,安装基础预处理;步骤二,测量放样;步骤三,基层钢骨架与可调节的挂件安装:步骤四:不规则金属板的安装;步骤五,验收阶段。采用了本发明所述施工工艺安装的造型柱或墙壁不仅提高了造型墙以及造型柱的整体视觉效果,同时还节省了安装材料、降低了安装成本、缩短了安装工期。
Irregular metal whole plate splicing installation construction process
The invention discloses an irregular metal whole plate splicing installation construction process. The process comprises the following steps that 1, an installation foundation is pretreated; 2, measuring and setting out are performed; 3, a base layer steel framework and an adjustable hanging piece are installed; 4, irregular metal plates are installed; and 5, an acceptance check stage is carried out. According to a modeling column or wall installed by adopting the construction process, the overall visual effect of the modeling wall and the modeling column is improved, meanwhile, installation materials are saved on, the installation cost is reduced, and the installation period is shortened.
本发明公开了一种不规则金属整板拼接安装施工工艺,其包括有如下步骤:步骤一,安装基础预处理;步骤二,测量放样;步骤三,基层钢骨架与可调节的挂件安装:步骤四:不规则金属板的安装;步骤五,验收阶段。采用了本发明所述施工工艺安装的造型柱或墙壁不仅提高了造型墙以及造型柱的整体视觉效果,同时还节省了安装材料、降低了安装成本、缩短了安装工期。
Irregular metal whole plate splicing installation construction process
一种不规则金属整板拼接安装施工工艺
TAN XUDONG (Autor:in) / YU TINGQI (Autor:in) / OU CHUANCHAO (Autor:in) / CAO LICHAO (Autor:in)
19.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Curved surface GRG plate splicing installation structure and construction method
Europäisches Patentamt | 2024
|Irregular splicing material dry-hanging structure and construction method thereof
Europäisches Patentamt | 2015
|