Construction method for deepwater cast-in-situ bored pile with thin covering layer
The invention relates to a construction method of a deepwater cast-in-situ bored pile for a thin covering layer. The method comprises the steps that (1) a floating platform is built; 2) a guide hole platform is arranged on the floating platform built in the step 1), and mounting a drilling machine on the guide hole platform; (3) after all pile foundation hole leading operation is completed, the drilling machine is moved out of the hole leading platform; 4) an undercarriage is mounted and positioned; 5) the steel casing is lengthened and the lengthened steel casing is lowered; 6) bottom sealingbuilt-in concrete is poured; 7) rockfill is dumped and underwater grouting is performed; 8) a guiding hole platform completes system conversion, and a construction platform for drilling and pile pouring is formed; and 9) drilling and pile pouring operation is performed on the construction platform for drilling and pile pouring. According to the construction method for deepwater cast-in-situ boredpile with thin covering layer, the safety of the construction platform can be effectively ensured.
本发明涉及一种针对薄覆盖层的深水钻孔灌注桩的施工方法,该方法包括:1)搭建浮式平台;2)在步骤1)搭建的浮式平台上设置引孔平台,将钻机安装在引孔平台上;3)完成全部桩基引孔作业后,将钻机移出引孔平台;4)安装定位起落架;5)接长钢护筒及下放接长的钢护筒;6)浇筑封底嵌固混凝土;7)抛填碎石并水下注浆;8)引孔平台完成体系转换,形成钻孔灌注桩的施工平台;9)在钻孔灌注桩的施工平台上进行钻孔灌注桩作业。本发明提供了一种可有效确保施工平台安全性的针对薄覆盖层的深水钻孔灌注桩的施工方法。
Construction method for deepwater cast-in-situ bored pile with thin covering layer
The invention relates to a construction method of a deepwater cast-in-situ bored pile for a thin covering layer. The method comprises the steps that (1) a floating platform is built; 2) a guide hole platform is arranged on the floating platform built in the step 1), and mounting a drilling machine on the guide hole platform; (3) after all pile foundation hole leading operation is completed, the drilling machine is moved out of the hole leading platform; 4) an undercarriage is mounted and positioned; 5) the steel casing is lengthened and the lengthened steel casing is lowered; 6) bottom sealingbuilt-in concrete is poured; 7) rockfill is dumped and underwater grouting is performed; 8) a guiding hole platform completes system conversion, and a construction platform for drilling and pile pouring is formed; and 9) drilling and pile pouring operation is performed on the construction platform for drilling and pile pouring. According to the construction method for deepwater cast-in-situ boredpile with thin covering layer, the safety of the construction platform can be effectively ensured.
本发明涉及一种针对薄覆盖层的深水钻孔灌注桩的施工方法,该方法包括:1)搭建浮式平台;2)在步骤1)搭建的浮式平台上设置引孔平台,将钻机安装在引孔平台上;3)完成全部桩基引孔作业后,将钻机移出引孔平台;4)安装定位起落架;5)接长钢护筒及下放接长的钢护筒;6)浇筑封底嵌固混凝土;7)抛填碎石并水下注浆;8)引孔平台完成体系转换,形成钻孔灌注桩的施工平台;9)在钻孔灌注桩的施工平台上进行钻孔灌注桩作业。本发明提供了一种可有效确保施工平台安全性的针对薄覆盖层的深水钻孔灌注桩的施工方法。
Construction method for deepwater cast-in-situ bored pile with thin covering layer
针对薄覆盖层的深水钻孔灌注桩的施工方法
PAN CHENGWEN (Autor:in) / ZHOU WEI (Autor:in) / YU JINFENG (Autor:in) / DENG ZHONGZHEN (Autor:in) / LI PING'AN (Autor:in)
23.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deepwater cast-in-situ bored pile construction method
Europäisches Patentamt | 2023
|Deepwater steel trestle cast-in-situ bored pile construction method
Europäisches Patentamt | 2020
|