Earthwork transportation system and construction method thereof
An earthwork transportation system comprises a pair of sliding rails arranged on the outer side of the first side edge and the outer side of the second side edge of the foundation pit respectively. The portal frame is arranged on the sliding rail and slides in the extending direction of the sliding rail, the portal frame comprises two supports arranged on the sliding rail and a cross beam connected with the two supports, and a soil sampling box is arranged on the cross beam and can move in the extending direction of the cross beam. The excavator system is arranged on the outer side of the third side edge and comprises a control part, a soil conveying hopper and a conveying belt, the control part is used for controlling the soil conveying hopper and the conveying belt, the soil conveying hopper faces the foundation pit, and the conveying belt extends to the exterior of the building from the foundation pit. The earthwork transportation system is mechanically operated in the whole process, the labor consumption is greatly reduced, the transportation speed is high, the efficiency is high, the earthwork excavation construction period is shortened, and the construction cost is reduced.
一种土方运输系统,包括分别设置于所述基坑的所述第一侧边、所述第二侧边外侧的一对滑动轨道;设置在所述滑动轨道上并沿所述滑动轨道延伸方向滑动的龙门架,所述龙门架包括分别设置于所述滑动轨道的两个支架,以及连接所述两个支架的横梁,所述横梁上设置有取土箱,所述取土箱可沿横梁延伸方向移动;设置在所述第三侧边外侧的挖机系统,所述挖机系统包括控制部、运土斗和传送带,所述控制部用以控制所述运土斗和所述传送带,所述运土斗面向所述基坑设置,所述传送带由所述基坑延伸至所述建筑物外部。该土方运输系统,全程机械化操作,大大减少了人力耗用,运输速度快、效率高,有利于缩短土方开挖施工工期、降低施工成本。
Earthwork transportation system and construction method thereof
An earthwork transportation system comprises a pair of sliding rails arranged on the outer side of the first side edge and the outer side of the second side edge of the foundation pit respectively. The portal frame is arranged on the sliding rail and slides in the extending direction of the sliding rail, the portal frame comprises two supports arranged on the sliding rail and a cross beam connected with the two supports, and a soil sampling box is arranged on the cross beam and can move in the extending direction of the cross beam. The excavator system is arranged on the outer side of the third side edge and comprises a control part, a soil conveying hopper and a conveying belt, the control part is used for controlling the soil conveying hopper and the conveying belt, the soil conveying hopper faces the foundation pit, and the conveying belt extends to the exterior of the building from the foundation pit. The earthwork transportation system is mechanically operated in the whole process, the labor consumption is greatly reduced, the transportation speed is high, the efficiency is high, the earthwork excavation construction period is shortened, and the construction cost is reduced.
一种土方运输系统,包括分别设置于所述基坑的所述第一侧边、所述第二侧边外侧的一对滑动轨道;设置在所述滑动轨道上并沿所述滑动轨道延伸方向滑动的龙门架,所述龙门架包括分别设置于所述滑动轨道的两个支架,以及连接所述两个支架的横梁,所述横梁上设置有取土箱,所述取土箱可沿横梁延伸方向移动;设置在所述第三侧边外侧的挖机系统,所述挖机系统包括控制部、运土斗和传送带,所述控制部用以控制所述运土斗和所述传送带,所述运土斗面向所述基坑设置,所述传送带由所述基坑延伸至所述建筑物外部。该土方运输系统,全程机械化操作,大大减少了人力耗用,运输速度快、效率高,有利于缩短土方开挖施工工期、降低施工成本。
Earthwork transportation system and construction method thereof
一种土方运输系统及其施工方法
YU HAIJIE (Autor:in) / ZHANG YI (Autor:in) / GAO WEIFENG (Autor:in) / SUN CHENG (Autor:in)
23.03.2021
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR FOUNDATION PIT EARTHWORK TRANSPORTATION AND CRUSHING
Europäisches Patentamt | 2021
|