Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel pipe pile construction guide mechanism based on pile foundation engineering
The invention discloses a steel pipe pile construction guide mechanism based on pile foundation engineering, and belongs to the technical field of steel pipe piles. The mechanism comprises a top plate; universal wheels are fixedly connected with the four corners of the lower surface of the top plate through supporting legs; two clamping mechanisms in bilateral symmetry are arranged on the upper surface of the top plate; and material leaking holes are formed in the positions, corresponding to the clamping mechanisms, of the upper surface of the top plate. According to the steel pipe pile construction guide mechanism based on pile foundation engineering, the clamping mechanisms are arranged, and two arc-shaped plates can clamp a steel pipe pile, so that the steel pipe pile can be fixed; a second threaded column is rotated through a screwing ring, the arc-shaped plates can move under the action of a second threaded cap, at the moment, the two arc-shaped plates can get away from each otherand do not clamp the steel pipe pile any more, and the steel pipe pile gradually slide down and fall down; and through the arrangement of the material leaking holes and a collecting hopper, the steelpipe pile enters into the collecting hopper through the material leaking holes and is finally discharged through the collecting hopper, and the steel pipe pile can be discharged into a discharging mechanism through the collecting hopper and can be finally discharged through the discharging mechanism.
本发明公开了基于桩基工程的钢管桩施工导向机构,属于钢管桩技术领域,包括顶板,所述顶板的下表面的四角处均通过支撑腿固定连接有万向轮,所述顶板的上表面设置有两个左右对称的夹持机构,顶板的上表面对应夹持机构的位置开设有漏料孔。本发明中,通过设置夹持机构,其中两个弧形板能够夹住钢管桩,从而能够实现对钢管桩的固定,通过拧环旋转第二螺纹柱旋转,在第二螺纹帽的作用下弧形板能够移动,此时两个弧形板能够相互远离并不再夹住钢管桩,此时钢管桩逐渐滑落并掉下,通过设置漏料孔和收集斗,钢管桩通过漏料孔进入至收集斗内,最后通过收集斗排出,收集斗可以将钢管桩排入至排放机构内,最后可以通过排放机构排出。
Steel pipe pile construction guide mechanism based on pile foundation engineering
The invention discloses a steel pipe pile construction guide mechanism based on pile foundation engineering, and belongs to the technical field of steel pipe piles. The mechanism comprises a top plate; universal wheels are fixedly connected with the four corners of the lower surface of the top plate through supporting legs; two clamping mechanisms in bilateral symmetry are arranged on the upper surface of the top plate; and material leaking holes are formed in the positions, corresponding to the clamping mechanisms, of the upper surface of the top plate. According to the steel pipe pile construction guide mechanism based on pile foundation engineering, the clamping mechanisms are arranged, and two arc-shaped plates can clamp a steel pipe pile, so that the steel pipe pile can be fixed; a second threaded column is rotated through a screwing ring, the arc-shaped plates can move under the action of a second threaded cap, at the moment, the two arc-shaped plates can get away from each otherand do not clamp the steel pipe pile any more, and the steel pipe pile gradually slide down and fall down; and through the arrangement of the material leaking holes and a collecting hopper, the steelpipe pile enters into the collecting hopper through the material leaking holes and is finally discharged through the collecting hopper, and the steel pipe pile can be discharged into a discharging mechanism through the collecting hopper and can be finally discharged through the discharging mechanism.
本发明公开了基于桩基工程的钢管桩施工导向机构,属于钢管桩技术领域,包括顶板,所述顶板的下表面的四角处均通过支撑腿固定连接有万向轮,所述顶板的上表面设置有两个左右对称的夹持机构,顶板的上表面对应夹持机构的位置开设有漏料孔。本发明中,通过设置夹持机构,其中两个弧形板能够夹住钢管桩,从而能够实现对钢管桩的固定,通过拧环旋转第二螺纹柱旋转,在第二螺纹帽的作用下弧形板能够移动,此时两个弧形板能够相互远离并不再夹住钢管桩,此时钢管桩逐渐滑落并掉下,通过设置漏料孔和收集斗,钢管桩通过漏料孔进入至收集斗内,最后通过收集斗排出,收集斗可以将钢管桩排入至排放机构内,最后可以通过排放机构排出。
Steel pipe pile construction guide mechanism based on pile foundation engineering
基于桩基工程的钢管桩施工导向机构
ZHOU GUIYING (Autor:in)
26.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel pipe pile construction guide frame based on pile foundation engineering
Europäisches Patentamt | 2021
|CONSTRUCTION METHOD OF STEEL PIPE PILE, AND STEEL PIPE PILE FOUNDATION
Europäisches Patentamt | 2024
|CONSTRUCTION METHOD OF STEEL PIPE PILE AND STEEL PIPE PILE FOUNDATION
Europäisches Patentamt | 2024
|