Foundation pit supporting pile top crown beam structure and construction method thereof
The invention discloses a foundation pit supporting pile top crown beam structure and a construction method thereof, and relates to the technical field of foundation pit supporting pile top crown beamstructures. In order to facilitate construction, the top crown beam structure specifically comprises a first frame body and a second frame body, cross beams distributed at equal intervals are arranged on the first frame body and the second frame body, assembly inserting holes distributed evenly are formed in the outer walls of the bottoms of the first frame body and the second frame body, a firstfixing rod and a second fixing rod are inserted into the assembly inserting holes respectively, and the second fixing rods correspond to the cross beams in position. By arranging the first frame body, the second frame body and other structures, the first frame body and the second frame body can be used as a main frame for supporting during installation, the structural firmness is guaranteed, a large amount of steel bar erecting time is saved, and the construction period is effectively shortened; and by arranging connecting rods, connecting sleeves and other structures, a user can disassembleand assemble according to the required height, so that multi-layer erection is achieved, and the flexibility is improved.
本发明公开了一种基坑支护桩顶冠梁结构及其施工方法,涉及基坑支护桩顶冠梁结构技术领域。为了便于施工,冠梁结构具体包括第一架体和第二架体,第一架体和第二架体上均设置有等距分布的横梁,第一架体和第二架体底部外壁均开设有均匀分布的装配插孔,装配插孔内分别插接有第一固定杆和第二固定杆,第二固定杆的位置均匀横梁对应。本发明通过设置第一架体、第二架体等结构,在安装时能够以第一架体和第二架体作为主框架进行支撑,保障了结构牢固度,并节省了大量架设钢筋的时间,有效缩短工期;通过设置连接杆和连接套筒等结构,使用者能够根据需求高度进行拆装,以实现多层架设,提升了灵活性。
Foundation pit supporting pile top crown beam structure and construction method thereof
The invention discloses a foundation pit supporting pile top crown beam structure and a construction method thereof, and relates to the technical field of foundation pit supporting pile top crown beamstructures. In order to facilitate construction, the top crown beam structure specifically comprises a first frame body and a second frame body, cross beams distributed at equal intervals are arranged on the first frame body and the second frame body, assembly inserting holes distributed evenly are formed in the outer walls of the bottoms of the first frame body and the second frame body, a firstfixing rod and a second fixing rod are inserted into the assembly inserting holes respectively, and the second fixing rods correspond to the cross beams in position. By arranging the first frame body, the second frame body and other structures, the first frame body and the second frame body can be used as a main frame for supporting during installation, the structural firmness is guaranteed, a large amount of steel bar erecting time is saved, and the construction period is effectively shortened; and by arranging connecting rods, connecting sleeves and other structures, a user can disassembleand assemble according to the required height, so that multi-layer erection is achieved, and the flexibility is improved.
本发明公开了一种基坑支护桩顶冠梁结构及其施工方法,涉及基坑支护桩顶冠梁结构技术领域。为了便于施工,冠梁结构具体包括第一架体和第二架体,第一架体和第二架体上均设置有等距分布的横梁,第一架体和第二架体底部外壁均开设有均匀分布的装配插孔,装配插孔内分别插接有第一固定杆和第二固定杆,第二固定杆的位置均匀横梁对应。本发明通过设置第一架体、第二架体等结构,在安装时能够以第一架体和第二架体作为主框架进行支撑,保障了结构牢固度,并节省了大量架设钢筋的时间,有效缩短工期;通过设置连接杆和连接套筒等结构,使用者能够根据需求高度进行拆装,以实现多层架设,提升了灵活性。
Foundation pit supporting pile top crown beam structure and construction method thereof
一种基坑支护桩顶冠梁结构及其施工方法
YAN HUI (Autor:in) / XIE YAN (Autor:in) / LI XIAOLONG (Autor:in)
26.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Pile foundation joist light supporting structure and construction method thereof
Europäisches Patentamt | 2021
|Composite foundation pile supporting structure and composite foundation construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|